F136 Team Begins Ground Tests On Second F-35 Powerplant | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, Feb 05, 2009

F136 Team Begins Ground Tests On Second F-35 Powerplant

Beats Contract Schedule By A Month

The GE Rolls-Royce Fighter Engine Team recently began testing its first production-configuration F136 engine for the F-35 Lightning II aircraft a month ahead of contract schedule, a major milestone in the development program.

The first complete new-build F136 engine began testing January 30, 2009, under the System Development and Demonstration (SDD) contract with the US Government Joint Program Office for the F-35 Joint Strike Fighter program. This represents the first complete engine assembled following US Government validation of the F136 design in 2008.

The F136 program has already totaled more than 800 hours of risk-reduction testing with two earlier engine prototypes, incorporating new-build components. The first runs of the new F136 engine occurred at the GE facility in Evendale, OH.

The team says additional engine builds are already under way, with several engines scheduled to be in test by the end of 2009.

"This new F136 engine represents a major achievement for our powerful partnership. We are into the exciting part of the program, as we begin demonstrating what the F136 can do. We’ve combined the best technologies from GE and Rolls-Royce into an outstanding design that will benefit the military customer over the long run," said Jean Lydon-Rodgers, President of the GE Rolls-Royce Fighter Engine Team.

"This is our biggest milestone yet. Once again, the F136 team delivered on time and on budget. With a significant temperature margin and affordable growth built into the design, the F136 will offer outstanding value when it becomes available to the first military customer in 2012," said Mark Rhodes, Senior Vice President of the GE Rolls-Royce Fighter Engine Team.

The first test runs for the new F136 engine top a year of significant achievements for the GE Rolls-Royce Fighter Engine Team. The program successfully completed Critical Design Review in 2008, as well as completing the first testing at the unique, new Peebles, OH test site, and full afterburner test runs at the US Air Force Arnold Engineering Development Center (AEDC) test facility in Tennessee.

The F136 engine program has a solid history of executing its contract on schedule and within budget. As a result, the GE Rolls-Royce Fighter Engine Team consistently receives "exceptional" reviews from the JPO for program execution.

Developed as an alternative to the Pratt & Whitney F135 turbofan originally slated to power the F-35, the F136 will be available to power all variants of the F-35 Lightning II aircraft for the US military and eight partner nations. About 900 engineers and technicians are engaged in the F136 program at GE Aviation's Cincinnati, OH headquarters, and at Rolls-Royce facilities in Indianapolis and Bristol, England.

FMI: www.fighterengineteam.com

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC