American Eurocopter Notes First US Overhaul of EC135 Main Gear Box | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, May 16, 2009

American Eurocopter Notes First US Overhaul of EC135 Main Gear Box

At an event held this week in its Dynamic Component Repair (DCR) facility, American Eurocopter celebrated the completion of the first overhaul of a Main Gear Box for an EC135 helicopter. Employees and executives from all over the company joined the DCR team for this important milestone. American Eurocopter received approval to repair and overhaul EC135 main gear boxes at the beginning of April and now offers local repair and overhaul services for all EC135 dynamic components. With this first completion, these high quality services are now available to U.S. customers with a reduced turn around time.

"This completion reflects our commitment to providing overhaul and repair solutions for our EC135 customers," said Marc Paganini, President and CEO of American Eurocopter. "Our company focus is to provide services here in the United States that meets the demands of all our customers and we will continue to enhance our services as their needs evolve."

In the United States there are over 200 EC135 that will benefit from the same high-quality, certified overhaul and repair services that they received from the OEM ZF Luftfahrttechnik in Germany.

The preparation to add the EC135 repairs and overhauls to the Dynamic Component Repair facility at American Eurocopter was quite extensive. It included the certification of American Eurocopter staff, and the acquisition of initial inventory and tooling. One of the major achievements was the modification of the company's multi-purpose test bench. In addition to the test bench's existing capabilities for BO105, BK117, AS365, EC120 and EC145 main gear boxes, the scope has been enlarged to include the EC135 main gear box.

FMI: www.eurocopterusa.com

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC