White House Aero-Hit-List #3: F-22 Raptor Fighter Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Fri, May 08, 2009

White House Aero-Hit-List #3: F-22 Raptor Fighter Aircraft

$17 Billion Cut... But Trillions More Spent Elsewhere

The Obama Administration, in the process of spending trillions of dollars for all manner of programs and projects, is trumpeted the 17 Billion dollars it is trying to cut from the Federal Budget. Rather than try to digest them all en masse, we'll look at each of them one at a time and allow you to make up YOUR mind as to the rationale and wisdom for the decisions included below. Herewith; another of the programs on the chopping block that has an aviation or aerospace connotation.

From the 'Terminations, Reductions, and Savings' document published this week by the OMB, as part of the FY 2010 US Budget:

Proposal: The Administration proposes to terminate the F-22 Raptor program after production of the planned 187 aircraft because the Department of Defense (DOD) has determined that 187 F-22s, together with other fighter aircraft including the new Joint Strike Fighter now in production, will be able to meet foreseeable threats.

Justification: This proposal would terminate procurement of the F-22 Raptor after 2009 when the current multiyear procurement contract ends. In December 2004, DOD determined that 183 F-22s would be sufficient to meet its needs. The Administration's current plans would provide a total of 187 aircraft, including four additional F-22s funded in the 2009 supplemental request to replace legacy aircraft lost in the war theater. Once these 187 aircraft are built, the production line will close. Both the Government Accountability Office and Congressional Budget Office have questioned the affordability of continuing the F-22 program, at about $3.5 billion per year, while simultaneously making other large procurements, such as the Joint Strike Fighter.

Moreover, several reviews within DOD, for example the 2006 Quadrennial Defense Review, have confirmed that 187 F-22s, together with the planned growth in the fleet of Joint Strike Fighters to 2,443, will meet DOD's requirements to maintain air superiority and to attack enemy forces on the ground.

FMI: www.whitehouse.gov/omb/budget/fy2010/assets/trs.pdf

 


Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC