Europe-Based Helo Det Provides Critical Support to Fleet | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, May 03, 2009

Europe-Based Helo Det Provides Critical Support to Fleet

Helicopter Sea Combat Squadron (HSC) 28, the "Dragon Whales", Naples Detachment continually serves 6th fleet as the only U.S. Navy helicopter detachment in Europe. "It's really rewarding because not only do I love to fly but I also get the chance to really make a difference in the average life of Sailors both by bringing them their mail through vertical replenishments or by rescuing someone at sea," said Lt. Stephanie Erwin, pilot for HSC-28 Naples Det. HSC-28 Naples Det., forward-deployed to Naval Support Activity (NSA), Naples Capodichino base.

The main mission of HSC-28 is to provide service and logistical support for 6th Fleet and its tenant commands. In addition to providing support in the Naples region, HSC-28 deploys with USS Mount Whitney (LCC/JCC 20).

"We deploy with the Mount Whitney as a search and rescue platform when it is underway," said Lt. Cmdr. Paula Langille, officer in charge of HSC-28 Naples Det. The helicopter detachment flies multiple times a week to keep their skills sharp and qualifications up to date for both pilots and crew members.

"We usually fly about three times a week for hours at a time all for training," said Aviation Warfare System Operator 1st Class Marcus Monreal. The detachment has only one MH-60 Sierra Knight Hawk which poses some challenges for the crew.

"Helicopters have a lot of moving parts, so there are many things that tend to break down," said Langille. "This means it takes everyone working at 100 percent all the time to make sure the aircraft is ready to fly, and we accomplish any mission."

The air crew and maintainers will spend three to six months deployed in Naples while the pilots spend closer to seven months before rotating back to Norfolk. [ANN Salutes Mass Communication Specialist Seaman Apprentice Kristopher Regan]

FMI: www.navy.mil/local/naveur

Advertisement

More News

NTSB Final Report: Piper PA-44-180

While On The Base Leg Of The Airport Traffic Pattern The Right Main Landing Gear Did Not Fully Extend Analysis: Both pilots reported that after performing airwork they returned to >[...]

Classic Aero-TV: The Bizarre Universe of Klyde Morris Cartoons

From 2023 (YouTube Edition): Putting the ANT in Antihero A Beech Starship speeds along at altitude. “Deflectors on!” a voice from within the aircraft cries. “Look>[...]

ANN's Daily Aero-Term (11.09.25): Minimum Friction Level

Minimum Friction Level The friction level specified in AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces, that represents the m>[...]

Aero-News: Quote of the Day (11.09.25)

“Beginning this aircraft subsystem testing is the culmination of more than a decade of focused engineering and certification refinements. This is the moment where our intende>[...]

Classic Aero-TV: Falling for Para-Phernalia’s Softie Emergency Parachutes

From 2023 (YouTube Edition): The Best Option for A Pilots’ Worst Days Since its 1979 founding, Para-Phernalia, Inc. has designed and manufactured the Softie line of pilot eme>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC