Webb Telescope Reaches Another Milestone Towards 2018 Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Jan 29, 2017

Webb Telescope Reaches Another Milestone Towards 2018 Launch

Raytheon Completes Factory Acceptance Testing Of Flight Operations System For NASA's James Webb Space Telescope

Factory acceptance testing of the flight operations system for the James Webb Space Telescope has been completed by Raytheon. With seven times the light-collecting power of its predecessor, the Hubble Space Telescope, this next-generation telescope will gather data and images of dust clouds, stars and galaxies deeper into space. 

Over 800 requirements were successfully verified on the JWST ground control system during the testing conducted at Raytheon's Aurora, Colorado, facility, bringing NASA's next space observatory one step closer to the scheduled 2018 launch.

"The JWST flight operations system is our latest generation of mission management and command and control capabilities for satellite operations," said Matt Gilligan, vice president of Raytheon Navigation and Environmental Solutions.  "Our ground control system will download data from space and fly the telescope as it penetrates through cosmic dust to unlock the universe's secrets like never before."

JWST takes observations in the infrared spectrum to penetrate cosmic dust to reveal the universe's first galaxies, while observing newly forming planetary systems. JWST is expected to make observations for five years, will carry enough fuel for 10 years, and is designed to withstand impacts of space debris as it orbits far beyond the Earth's Moon.  

Raytheon installed the ground control system for JWST on the campus of the Johns Hopkins University in Baltimore, Maryland, under contract to the Space Telescope Science Institute.

(Source: Raytheon news release. Image from file)

FMI: www.raytheon.com

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC