Fairchild Controls Earns USAF Contract For C-130 Air Turbines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, Mar 26, 2008

Fairchild Controls Earns USAF Contract For C-130 Air Turbines

Will Resume Production After Over A Decade

EADS North America’s Fairchild Controls business unit tells ANN the company will soon restart the production of TP-25 air turbine motors for the C-130 Hercules airlifter under US Air Force contract. 

The award enables Fairchild Controls to resume new OEM (original equipment manufacturer) production of the air turbine motors for the first time in over a decade. Fairchild Controls previously built over 2,000 TP-25s during a 50-year production run that concluded in 1993.

“This order is a top priority at Fairchild Controls, as it strengthens a key link in the supply chain for a truly legendary aircraft that will continue to serve the U.S. Air Force and our allies for many years to come,” said Fairchild Controls President Scott Selle.

The TP-25 is a 25 shaft horsepower turbine that works with an integrated gas turbine compressor and a 20 kVA generator to supply aircraft electrical power, and is used on every Hercules from the original C-130A version through early H models.

The new production order follows several recent US Air Force contracts awards to Fairchild Controls for ongoing TP-25 repair and overhaul servicing.  The air turbine motors covered by these maintenance contracts are being processed at the company’s Frederick, MD facility -- where the new-production TP-25s also are to be produced.

FMI: www.fairchild-controls.com

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC