AD: Pacific Aerospace Limited Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.27.25

AirborneNextGen-
10.28.25

Airborne-Unlimited-10.29.25

Airborne-Unlimited-10.30.25

AirborneUnlimited-10.17.25

Wed, Feb 21, 2018

AD: Pacific Aerospace Limited Airplanes

AD NUMBER: 2018-03-15

PRODUCT: Pacific Aerospace Limited Model 750XL airplanes.

ACTION: Final Rule, request for comments.

SUMMARY: This AD results from mandatory continuing airworthiness information (MCAI) issued by the aviation authority of another country to identify and correct an unsafe condition on an aviation product.

The MCAI describes the unsafe condition as abrasion damage of components or wiring behind the instrument panel.

DATES: This AD is effective March 5, 2018. The Director of the Federal Register approved the incorporation by reference of a certain publication listed in the AD as of March 5, 2018. Comments on this AD must be received by March 30, 2018.

COST: The FAA estimates that this AD will affect 22 products of U.S. registry. It further estimate that it would take about 3 work-hours per product to comply with the basic requirements of this AD.

The average labor rate is $85 per work-hour. Required parts would cost about $90 per product. Based on these figures, the FAA estimates the cost of the AD on U.S. operators to be $7,590, or $345 per product. The extent of abrasion damage could vary from airplane to airplane.

The FAA has no way of knowing how many airplanes may have abrasion damage or the extent of that damage; and so has no way of determining an estimated cost for repair.

FMI: AD

 


Advertisement

More News

Klyde Morris (10.27.25)

It Does Indeed Work Every Time, Klyde FMI: www.klydemorris.com>[...]

Airborne 10.27.25: MOSAIC Phase 1, Katana Returns, MOSAIC Town Hall!

Also: Orlando Air Show Cancelled, ATC Staffing Shortages, CH-47F Block II Chinooks, Sustainable $$ More than a decade of hard work, legal setbacks, and community advocacy has final>[...]

Airborne-NextGen 10.28.25: Police Drones, Nat'l Parks v UAVs, MOSAIC Phase 1

Also: MOSAIC Town Hall, Lockheed Martin Venus, Electric Aircraft Cooling, Korea Taps Archer The Miami-Dade Sheriff’s Office is at the front end of a year-long AI policing exp>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

NTSB Final Report: Airbus A321-271N (A1); Cessna 172N (A2)

The Local Controller’s Poor Judgment In Prioritization Of Their Ground Traffic Ahead Of Their Airborne Traffic Analysis: Hawaiian Airlines flight 70 (HAL70), N2165HA, an Airb>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC