Ready To Fly: B787 Dreamliner Sked To Fly, 12.15.09, 1800 GMT | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Dec 13, 2009

Ready To Fly: B787 Dreamliner Sked To Fly, 12.15.09, 1800 GMT

Final High-Speed Taxi Tests Completed Satisfactorily

Ready for flight... that's the feeling from many at Boeing as their 787 Dreamliner completed some of the final steps left before an actual test flight. Boeing completed high-speed taxi tests on the first 787 Dreamliner Saturday and confirmed that this is the last in a series of functional tests planned in preparation for first flight.

“Our pilots told me the airplane performed beautifully,” said Mike Delaney, vice president and chief project engineer for the 787. “We’re going through and analyzing the data to ensure we’re ready for first flight. From evaluations we’ve done so far, everything looks good.”

During the testing, the airplane reached a top speed of approximately 130 knots (150 mph, 240 kph), and the pilots lifted the nose gear from the pavement. Earlier in the week Boeing confirmed that a review and analysis of a Nov. 30 static test to validate the side-of-body modifications on the 787 Dreamliner had been completed, and the airplane structure validated for first flight.

During the test on the 787 Dreamliner static test airframe, the wing and trailing edges of the airframe were subjected to their limit load – the highest loads expected to be seen in service. During the test, the wing successfully deflected 18 feet, some 105 percent of the limit load. Anything over 100 percent is considered a successful test.

FMI: www.boeing.com, www.newairplane.com

Advertisement

More News

NTSB Final Report: Patriot Aircraft LLC CX1900A

After Draining Both Wing Fuel Tanks, A Significant Amount Of Water Was Observed In The Right Wing Fuel Tank Analysis: The pilot, who was also the owner of the experimental amateur->[...]

Aero-News: Quote of the Day (12.06.25)

“Airbus apologises for any challenges and delays caused to passengers and airlines by this event. The Company thanks its customers, the authorities, its employees and all rel>[...]

ANN's Daily Aero-Term (12.06.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

ANN's Daily Aero-Linx (12.06.25)

Aero Linx: Taylorcraft Foundation, Inc. The Taylorcraft Foundation is exclusively organized for charitable, educational & scientific activities and will preserve the history an>[...]

Airborne-NextGen 12.02.25: Honda eVTOL, Arctus High-Alt UAS, Samson Patent

Also: USAF Reaper Accident, Baikonur Damage, Horizon eVTOL IFR/FIKI, New Glenn Update Honda has outlined its clearest timeline yet for its entry into the world of electric vertical>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC