Engineers Still Discussing Discovery Repairs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Nov 09, 2010

Engineers Still Discussing Discovery Repairs

GUPC, Crack In Foam Insulation Delaying Launch

Engineers met in a series of meetings Monday to discuss inspection and repair options for space shuttle Discovery's ground umbilical carrier plate (GUCP) and a crack in the external fuel tank foam insulation. Discovery's launch was postponed Friday until at least Nov. 30 because of a hydrogen gas leak at the GUCP.


NASA File Photo

Technicians at NASA's Kennedy Space Center in Florida have been measuring the alignment of the plate on the external tank and performing leak checks. Crews began disconnecting the GUCP Tuesday after disconnecting the hydrogen vent line that attaches to the GUCP. Managers will assess repair options after the disconnected GUCP is inspected.

Teams also have begun analysis and inspection of the approximately 20-inch long crack in the external tank foam. Teams are planning to use terahertz or backscatter scans to see beneath the foam to look for any other potential issues. As early as Wednesday, technicians could begin dissecting the cracked section so foam experts can make a thorough evaluation in order to help determine the cause of the crack. Teams still are working out plans to reapply foam to the external tank after inspections are complete. Shuttle managers continue evaluating the data to determine the best repair methods and next launch opportunity for Discovery's STS-133 mission to the International Space Station.


NASA File Photo

Shuttle managers continue evaluating the data to determine the best repair methods and next launch opportunity for Discovery's STS-133 mission to the International Space Station.

FMI: www.nasa.gov

Advertisement

More News

Airborne 06.30.25: US v ADS-B Misuse, NatÂ’l STOL Fire, Volocopter Resumes

Also: Netherlands Donates 18 F16s, 2 737s Collide On Ramp, E-7 Wedgetail Cut, AgEagle's 100th In S Korea The Pilot and Aircraft Privacy Act was introduced in the House by Represent>[...]

Aero-News: Quote of the Day (07.06.25)

“This delivery represents more than just a milestone. It symbolizes our shared commitment to national security and our unwavering support for the men and women who serve on t>[...]

ANN's Daily Aero-Linx (07.06.25)

Aero Linx: Vintage Wings of Canada Foundation Vintage Wings of Canada is a not-for-profit, charitable organization with a collection of historically significant aircraft and is run>[...]

Classic Aero-TV: Portrait of the Army Aviation Heritage Foundation

From 2023 (YouTube Edition): To Preserve and Teach Incorporated as a non-profit domestic corporation in June 1997, the Army Aviation Heritage Foundation (AAHF) is a one-of-a-kind, >[...]

Airborne-NextGen 07.01.25: Volocopter Returns, B23 Energic, Iran Tech In UAVs?

Also: Air Taxis May Be Close, AgEagle Sells 100th, VAI Likes Bedford, AURA AERO Cleans Up Volocopter has resumed work towards the certification of its VoloCity eVTOL, this time und>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC