NATA Happy With Delay On Handbook Bulletin | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Sep 25, 2004

NATA Happy With Delay On Handbook Bulletin

FAA postpones publication of controversial bulletin dealing with part 135 configuration and maintenance

The Federal Aviation Administration has postponed for an additional 60 days the controversial handbook bulletin, HBAW 04-06, that addresses aircraft configuration and maintenance programs for aircraft operated under Part 135.  Many operators, in order to meet a "nine or fewer passenger seat" configuration standard, have placarded or otherwise blocked certain seats to make them unusable.  These aircraft are then generally maintained under 134.411(a)(1) requirements.  The new guidance in HBAW 04-06 would require the physical removal of these seats, or a switch to the 134.411(a)(2) maintenance program.
 
Most operators would be required to obtain a STC for the seat removal.  Using a placard to make a seat unusable by passengers, even if previously approved by the FAA, would not be acceptable under this new policy.
 
Until this delay, operators were expected to bring the aircraft into conformity with the bulletin within 30 days.  If the operator elected to obtain a STC for seat removal, that process would have begun within the 30-day window.

Through discussions with the leadership of FAA's Flight Standards Service, the NATA has successfully convinced the FAA to postpone the handbook bulletin's conformity dates.

"We are quite pleased that the FAA has heeded our request to provide an extension on this handbook bulletin," NATA vice president of government and industry affairs Eric Byer stated.  "Jim Ballough and his team at Flight Standards have been working closely with the association and its charter operators to ensure that a fair and equitable solution can be reached." 

The association has also secured a face-to-face meeting between its representatives, charter operators and Ballough and his staff to continue deliberations. "We welcome the opportunity to demonstrate to the FAA how this handbook bulletin will clearly hit small business charter operators in the wallet while providing no true safety benefits," concluded Byer.

FMI: www.nata.aero

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC