Better Late Than Never For Iranian Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Feb 17, 2004

Better Late Than Never For Iranian Airport

Khomeini Int'l Opens After Decades of Delays

Some projects just take a while to accomplish, such as Iran’s Imam Khomeini International Airport (IKIA).

The airport officially opened on Sunday, some three decades after construction began.

The opening marked the 25th anniversary of the return from exile of revolutionary leader Ayatollah Ruhollah Khomeini.

The airport’s Terminal 1 is operated by the Turkish-Austrian consortium Tepe-Akfen-Vie (TAV). The consortium is expected to complete the construction of Terminal 2 by 2006.

Located 45 kilometers south of Tehran, IKIA will replace Mehrabad International Airport situated closer to the center of the capital, taking over all domestic and international flights to the city. To date, construction of the new facility has cost $329 million.

The airport’s first phase gives it capacity to accommodate 12 million passengers and 200,000 tons of cargo annually. Depending on demand, IKIA’s design allows for an expansion to 40 million passengers and 700,000 tons of cargo in the future.

Work on the project began before the Islamic Revolution took place in 1979, but was halted due to political circumstances. Construction resumed in 1994. The Ministry of Roads and Transportation contracted Aeroports de Paris (ADP) to draw up IKIA’s master plan, undertake supervision of procurement, installation and integrate of airport equipment and systems.

FMI: www.khomeini.com/gatewaytoheaven/Information/ImamKhomeiniInternationalAirport.htm

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

ANN's Daily Aero-Linx (07.03.25)

Aero Linx: Colorado Pilots Association (CPA) Colorado Pilots Association was incorporated as a Colorado Nonprofit Corporation in 1972. It is a statewide organization with over 700 >[...]

ANN's Daily Aero-Term (07.03.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC