F/A-18E/F Complete Flight Tests With New JAGM Ordinance | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, Jan 05, 2011

F/A-18E/F Complete Flight Tests With New JAGM Ordinance

Flights Included Refueling, Near Supersonic Speeds

A series of flying quality tests of the U.S. Navy's F/A-18E/F while carrying the Joint Air-to-Ground Missile (JAGM) was recently completed at Patuxent River Naval Air Station, MD. Lockheed Martin conducted a comprehensive series of tests which consisted of six flights between October 5 and November 2 with a total flying time of 11.2 hours.


File Photo

The aircraft flew at altitudes ranging from 5,000 feet to 35,000 feet and at speeds approaching Mach 1.0. During each flight, the Super Hornet was refueled in the air by a support tanker to enable the aircraft to reach all the required speeds and altitudes at which JAGM had to be tested.

The JAGM test articles were six instrumented measurement vehicles (IMVs) equivalent in weight, size and dimensions to tactical JAGM rounds and outfitted with resistive temperature devices, acoustic sensors and accelerometers to measure the flight environments experienced by the launchers and the missiles.

Three IMVs were loaded onto each of two new Navy fixed-wing triple-rail launchers designed and manufactured by Lockheed Martin and Marvin Engineering to carry JAGM on the F/A-18E/F. Fully outfitted, the Super Hornet could be configured to carry 18 JAGMs, as opposed to just four of the Maverick air-to-ground missiles that JAGM will replace.

For the flight series, the two "three-packs" of JAGM IMVs were carried at the most challenging stations -- outboard and midboard -- in varying load-out combinations with other weapon systems including bombs, anti-radiation missiles and air-to-air missiles, as well as external fuel tanks.

"The F/A-18E/F presents some of the most challenging environments for JAGM," said Hady Mourad, JAGM program director at Lockheed Martin Missiles and Fire Control. "Collecting vibration, acoustic and shock data in these environments for 11.2 hours of flight with no anomalies or problems represents a very successful beginning of flight test efforts that will continue into the EMD phase to integrate JAGM on the Super Hornet."

Lockheed Martin's Deputy Program Director Rick Packard, who is responsible for integrating JAGM with Navy platforms, said the company was very pleased with the results of the flying qualities tests. "When you couple the highly successful outcome of these flying quality tests with our previous hot and cold temperature missile motor tests, we remain confident in our ability to provide our customers with a single-missile-motor offering for JAGM, a critical capability voiced by all three Services since the inception of the joint program."


JAGM Ordinance Lockheed Martin Photo

"One of the key tenets of the JAGM program is to replace three aging weapon systems and their associated parts, supply and logistics networks with one weapon to increase operational flexibility and reduce support costs," Packard said. "We remain steadfastly committed to meeting that requirement."

Threshold aviation platforms include the U.S. Army's AH-64D Apache attack helicopter, the Army's Extended Range Multi-Purpose (ERMP) Sky Warrior unmanned aerial system, the U.S. Marine Corps' AH-1Z Super Cobra attack helicopter, the U.S. Navy's MH-60R Seahawk armed reconnaissance helicopter and the Navy's F/A-18E/F Super Hornet jet fighter. The tri-service Joint Strike Fighter also is under consideration as an objective platform.

The initial operational capability of JAGM on the AH-64D, AH-1Z and F/A-18E/F is scheduled for 2016, and the IOC for the MH-60R and ERMP is 2017.

FMI: www.lockheedmartin.com, www.navy.mil

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC