NGC Secures Ground To Air Communication Requirements For Polish Airports | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Nov 25, 2018

NGC Secures Ground To Air Communication Requirements For Polish Airports

Installations Will Be Completed By The End Of The Year

Following the installation of ATM equipment at four remote ground stations (Sieradz, Radom, G?bin and Brzesko) in 2017, PANSA has now added almost 30 locations to be equipped with Sapphire ATM communication systems. All of the installations will be completed by the end of 2018.

“PANSA is a very discerning customer; they know exactly what they need and the Sapphire solution fits their technical requirements,” said Danny Milligan, managing director, Park Air Systems, Northrop Grumman. “With full backwards compatibility, unrivalled connectivity, scalability and security for voice and data, the Park Air T6 radio checks all the boxes of modern airspace communication.”

The Park Air T6 radio is the lightest and smallest radio of its kind in the ATM market. Its size offers greater utility of space as well as lower shipping costs. Combined with a design that makes it the most power efficient available, the complete lack of hazardous materials and a host of other technical features, this new radio meets the most demanding specifications set by airports worldwide.

PANSA maintenance engineers received their training at the Park Air Systems Academy prior to delivery. This modern, bespoke facility near Peterborough has been given ratings of “exceeds expectations” from trainees since its opening in 2016.

(Image provided with Northrop Grumman news release)

FMI: www.northropgrumman.com

Advertisement

More News

ANN's Daily Aero-Term (12.08.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (12.08.25)

Aero Linx: T-34 Association, Inc. The T-34 Association was formed in July 1975 so that individuals purchasing then military surplus T-34As had an organization which would provide s>[...]

NTSB Final Report: Piper PA-31T3

As He Released The Brakes To Begin Taxiing, The Brake Pedals Went To The Floor With No Braking Action Analysis: The pilot reported that during engine start up, he applied the brake>[...]

Aero-News: Quote of the Day (12.08.25)

“Legislation like the Mental Health in Aviation Act is still imperative to hold the FAA accountable for the changes they clearly acknowledge need to be made... We cannot wait>[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC