Navy Awards Contract For Operational Test CH-53K Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jun 08, 2013

Navy Awards Contract For Operational Test CH-53K Aircraft

Operational Evaluation For The Helicopters To Be Conducted By The USMC

The Naval Air Systems Command (NAVAIR) has awarded a $435 million cost-plus-incentive contract to Sikorsky to build four production-representative CH-53K heavy lift helicopters for the U.S. Marine Corps on May 30. These four aircraft will be the System Demonstration Test Articles (SDTA) that the Marines will test during operational evaluation.

“The SDTA contract represents an exciting and significant milestone in our program,” said Col. Robert Pridgen, the Heavy Lift Helicopters program manager for NAVAIR. “We are well on our way to making the CH-53K a reality for our Marines and our naval fleet. The capability this aircraft brings, in every clime and place, is critical to sustaining the future missions of the Marine Air/Ground Task Force. The future of heavy lift is bright.”
 
“The four SDTA aircraft are based on the configuration of the fourth and final flight test aircraft currently being assembled on the prototype production line,” said Dr. Michael Torok, Sikorsky’s CH-53K Program Vice President. “We truly appreciate the high level of confidence the Navy and Marine Corps have shown to the CH-53K team as we move forward with this important next phase of the program.”
 
The Navy has included the SDTA helicopters as an additional contract line item under the existing $3.5 billion System Development and Demonstration (SDD) contract initially awarded to Sikorsky in April 2006. The contract schedule requires Sikorsky to deliver the first SDTA aircraft in 39 months, and the fourth by the end of March 2017, when the Marines will begin operational evaluation. The contract’s fee arrangement incentivizes Sikorsky to deliver early. Sikorsky will perform final assembly of the SDTA aircraft at the company’s Florida Assembly and Flight Operations facility in West Palm Beach.
 
To date, Sikorsky has delivered two of the seven SDD CH-53K aircraft – the Ground Test Vehicle and the Static Test Article – into the test program, and is finalizing assembly of the four flight test aircraft and the Fatigue Test Article. First flight of a CH-53K prototype aircraft is expected in late 2014.

(Images provided by NAVAIR)

FMI: www.navair.navy.mil


Advertisement

More News

ANN's Daily Aero-Term (12.04.25): Cooperative Surveillance

Cooperative Surveillance Any surveillance system, such as secondary surveillance radar (SSR), wide-area multilateration (WAM), or ADS-B, that is dependent upon the presence of cert>[...]

ANN's Daily Aero-Linx (12.04.25)

Aero Linx: OX5 Aviation Pioneers Incorporated in 1955 as a Pa 501 (c)(3) Not for Profit Corporation, the OX5 Aviation Pioneers is dedicated to bringing before the public the accomp>[...]

NTSB Prelim: Extra Flugzeugproduktions EA 300/SC

The Pilot Appeared To Regain Control After Six Rotations And Attempted To “Fly Out” Inverted But Had Insufficient Altitude On November 8, 2025, at 1038 eastern standard>[...]

Classic Aero-TV: The Bally Bomber - The All Time Ultimate Warbird Replica?

From 2018 (YouTube Edition): Aero-News Talks With The Airplane's Builder One of the many unique airplanes at AirVenture 2018 was a 1/3-scale B-17 bomber built by Jack Bally, who ta>[...]

ANN's Daily Aero-Linx (12.05.25)

Aero Linx: Society of U.S. Army Flight Surgeons (SoUSAFS) The Society of US Army Flight Surgeons (SoUSAFS) serves to advance the science and art of Aerospace Medicine and its allie>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC