Boeing, Navy Equipment Upgrades Enhance Readiness, Affordability | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Apr 19, 2015

Boeing, Navy Equipment Upgrades Enhance Readiness, Affordability

Upgraded System Simplifies, Aids Aircraft Maintenance; Lowers Cost For US Navy, Marine Corps

Boeing has delivered the first of 10 upgraded aircraft diagnostic and maintenance systems to the U.S. Navy and Marine Corps. The devices, used for servicing military aircraft, consolidate depot level testing into a single station, improving efficiencies and lowering costs while maximizing use of existing equipment.

Boeing and the Navy recently unveiled the Reconfigurable Transportable Consolidated Automated Support System – Depot (RTCASS-D) at Naval Air Station North Island, San Diego.

After installation at Navy Fleet Repair Centers over the next year, the RTCASS-D will allow technicians to more efficiently test and troubleshoot electronic systems on aircraft that include the F/A-18 Hornet and Super Hornet; V-22 Osprey; AV-8B Harrier and other Navy and Marine Corps platforms.

“These upgraded test stations support our customers' depot-level readiness targets and missions while saving them time and money,” said Tim Murphy, RTCASS program manager, Boeing. “As the Navy works to consolidate its depot-level mission operations with the Boeing-built testers, we look forward to helping the service meet its increased performance and mobility requirements.”

“RTCASS-D is the first CASS-family tester designed and built exclusively for depot applications,” said Sam Winters, CASS/RTCASS integrated product team lead, PMA-260, Naval Air Systems Command. “The enhanced capabilities in this system allow Fleet Readiness Centers to offload test program sets from legacy testers cheaper and more quickly than ever before while also leveraging hundreds of test program sets previously built for CASS.”

(Image provided by Boeing)

FMI: www.boeing.com, www.navy.mil

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC