Oh... The Pain! NASA’s SpaceX Demo-2 Launch Rescheduled to Saturday Due to WX | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Thu, May 28, 2020

Oh... The Pain! NASA’s SpaceX Demo-2 Launch Rescheduled to Saturday Due to WX

They Only Needed Another 10-20 Minutes To Get Past The Worst of The Weather...

NASA and SpaceX scrubbed Wednesday’s launch attempt of the Demo-2 test flight to the International Space Station with astronauts Robert Behnken and Douglas Hurley due to unfavorable weather conditions around Launch Complex 39A at NASA’s Kennedy Space Center in Florida.

The launch of the SpaceX Crew Dragon to the ISS was scrubbed less than 20 minutes before the scheduled liftoff due to several 'launch violations' created by different hazards presented by the inclement weather.

SpaceX began removing propellant from the Falcon 9 rocket right away before 'safing' the emergency escape system and allowing the astronauts to exit the Crew Dragon spacecraft.

The instantaneous launch window reopens at 3:22 p.m. EDT, or 19:22 UTC, with a backup instantaneous launch opportunity available on Sunday, May 31 at 3:00 p.m. EDT, or 19:00 UTC. The launch is again scheduled from Launch Complex 39A at NASA’s Kennedy Space Center in Florida. The weather scenario right now seems to indicate a 40% potential for a successful weather window.

Keep in mind that weather hazards are predicated both on the threat to the launch itself as well as the conditions at sea should an inflight abort require a landing by parachute, into the Atlantic Ocean.

Once in orbit, the crew and SpaceX mission control will verify the spacecraft is performing as intended by testing the environmental control and life support systems, the maneuvering thrusters, and thermal control systems, among other things. Crew Dragon will perform a series of phasing maneuvers to position itself for rendezvous and docking with the International Space Station.

Some 19 hours after launch, the crew of Demo-2 is scheduled to complete docking with the ISS.

The spacecraft is designed to do this autonomously but astronauts onboard the spacecraft and the Space Station will be diligently monitoring approach and docking and can take control of the spacecraft if necessary.

Demo-2 is the final major test for SpaceX’s human spaceflight system to be certified by NASA for operational crew missions to and from the International Space Station. SpaceX is returning human spaceflight to the United States with one of the safest, most advanced systems ever built, and NASA’s Commercial Crew Program 'is a turning point for America’s future in space exploration that lays the groundwork for future missions to the Moon, Mars, and beyond.'

FMI: www.spacex.com, www.nasa.gov

Advertisement

More News

Oshkosh Memories: An Aero-News Stringer Perspective

From 2021: The Inside Skinny On What Being An ANN Oshkosh Stringer Is All About By ANN Senior Stringer Extraordinare, Gene Yarbrough The annual gathering at Oshkosh is a right of p>[...]

NTSB Prelim: Piper PA32RT

Video Showed That During The Takeoff, The Nose Baggage Door Was Open On May 10, 2025, about 0935 eastern daylight time, a Piper PA-32RT-300, N30689, was destroyed when it was invol>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

Aero-News: Quote of the Day (05.28.25)

"I think what is key, we have offered a bonus to air traffic controllers who are eligible to retire. We are going to pay them a 20% bonus on their salary to stay longer. Don't reti>[...]

ANN's Daily Aero-Term (05.28.25): Pilot Briefing

Aero Linx: Pilot Briefing The gathering, translation, interpretation, and summarization of weather and aeronautical information into a form usable by the pilot or flight supervisor>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC