Combined ISS Crews Get To Work | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Apr 14, 2008

Combined ISS Crews Get To Work

Expedition 16 To Return April 19

Following last Thursday’s successful docking, the Expedition 17 crew members spent their first full day aboard the International Space Station familiarizing themselves with their new home and working on a variety of experiments.

NASA reports the combined Expedition 16 and 17 crews began work on Bioemulsion, a Russian microorganism project, and ELITE-S2, an Italian Space Agency project that studies connections between the brain, motion and visualization in the absence of gravity.

Expedition 17 Commander Sergei Volkov and Expedition 16 Flight Engineer Yuri Malenchenko installed a temperature sensor switching unit as well as other hardware into the newly arrived Soyuz. Volkov also performed a Soyuz communications link check with Expedition 17 Flight Engineer Oleg Kononenko.

Expedition 16 Commander Peggy Whitson and Expedition 17 Flight Engineer Garrett Reisman participated in interviews with a New York radio program and a television station in Iowa. Whitson also performed some maintenance work on the US spacesuits.

Whitson, Malenchenko and South Korean 'tourinaut' So-yeon Yi are scheduled to return to Earth in the Soyuz TMA-11 spacecraft on April 19.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC