STS-125: Three Out Of Five Spacewalks Successfully Completed So Far | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, May 17, 2009

STS-125: Three Out Of Five Spacewalks Successfully Completed So Far

"Batting 1000" To This Point

STS-125 mission specialists John Grunsfeld and Drew Feustel finished the mission’s third spacewalk Saturday at 4:11 p.m. EDT. The spacewalk lasted 6 hours, 36 minutes. During the endeavor outside the shuttle, Feustel and Grunsfeld removed the Corrective Optics Space Telescope Axial Replacement and installed in its place the new Cosmic Origins Spectrograph. They also completed the Advanced Camera for Surveys electronic card replacement work. The spacewalkers were ahead of schedule and were able to complete part 2 of the ACS repair, installing a new electronics box and cable.

Space shuttle Atlantis’ 11-day mission is the final shuttle flight to NASA’s Hubble Space Telescope. The seven-member crew will enhance the observatory and ensure cutting-edge science. The mission puts in place advanced technology that improves the telescope’s discovery power by 10 to 70 times. The five scheduled spacewalks will install new instruments and thermal blankets, repair two existing instruments, refurbish subsystems and replace gyroscopes, batteries and a unit that stores and transmits science data to Earth. The result will be six working, complementary science instruments with new capabilities, and an extended operational lifespan through at least 2014.

Saturday, the spacewalkers focused on the installation of the telescope’s new Cosmic Origins Spectrograph and completed the Advanced Camera for Surveys repair work. Engineers from the Space Telescope Operations Control Center at Goddard Spaceflight Center in Maryland powered up both components and reported good aliveness tests. More tests will be conducted during the astronauts sleep period.

On Sunday, starting at 9:16 a.m., astronauts Mike Good and Mike Massimino will repair the Space Telescope Imaging Spectrograph and install the New Outer Blanket Layer during the fourth STS-125 spacewalk.

FMI: www.nasa.gov

Advertisement

More News

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

NTSB Prelim: Rutan Long-EZ

The Pilot Attempted Several Times To Restart The Engine And Diverted To Long Beach Airport/Daughtery Field On October 20, 2025, about 1603 Pacific daylight time, an experimental am>[...]

ANN's Daily Aero-Term (12.05.25): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (12.05.25)

"The latest development underscores the government of Malaysia’s commitment in providing closure to the families affected by this tragedy..." Source: From statements made by >[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC