First Fuselage Section For The A330-200F Freighter Delivered | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, May 02, 2009

First Fuselage Section For The A330-200F Freighter Delivered

Airbus' A330-200F program marked an important milestone with the recent delivery of the first major fuselage section for Airbus' new mid-size freighter. Assembled at the Airbus facility in Hamburg, Germany, this 11.6 metre-long forward fuselage section includes the A330-200F's large main-deck cargo door - which will enable the jetliner to carry cargo containers and freight pallets in a single row or in side-by-side arrangements, according to operators' needs.

The main deck cargo door is 141 inches wide and 101 inches high, and is a new feature for the A330 family. This same-sized door has been used on Airbus A300 and A310 cargo aircraft.

Delivery of the A330-200F's forward fuselage section was performed by one of the Airbus Beluga airlifters, which transported the airframe component from Hamburg to St. Nazaire, France for assembly of the cockpit. The completed section will then move to Toulouse, France, where final assembly of the no. 1 A330-200F will begin in the summer, followed by the aircraft's maiden flight later this year.

Jürgen Karow, the head of Airbus' Long-range Programme Centre of Excellence for fuselage and cabin, said targets have been met for the new freighter's quality, production timing and weight - achievements that are the result of cooperative efforts involving the Airbus design office and manufacturing department, as well as the associated suppliers.

 

The A330-200F will provide operators with a new-generation freighter derived from the A330 jetliner family.

FMI: www.airbus.com

Advertisement

More News

Classic Aero-TV: Pure Aerial Precision - The Snowbirds at AirVenture 2016

From 2016 (YouTube Edition): The Canadian Forces Snowbirds Can Best Be Described As ‘Elegant’… EAA AirVenture 2016 was a great show and, in no small part, it was>[...]

NTSB Final Report: Costruzioni Aeronautiche Tecna P2012 Traveller

Airplane Lunged Forward When It Was Stuck From Behind By A Tug That Was Towing An Unoccupied Airliner Analysis: At the conclusion of the air taxi flight, the flight crew were taxii>[...]

ANN's Daily Aero-Linx (11.23.25)

Aero Linx: International Stinson Club So you want to buy a Stinson. Well the Stinson is a GREAT value aircraft. The goal of the International Stinson Club is to preserve informatio>[...]

ANN's Daily Aero-Term (11.23.25): Request Full Route Clearance

Request Full Route Clearance Used by pilots to request that the entire route of flight be read verbatim in an ATC clearance. Such request should be made to preclude receiving an AT>[...]

Aero-News: Quote of the Day (11.23.25)

"Today's battlefield is adapting rapidly. By teaching our soldiers to understand how drones work and are built, we are giving them the skills to think creatively and apply emerging>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC