FAA to Implement Las Vegas Metroplex Project | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Feb 22, 2021

FAA to Implement Las Vegas Metroplex Project

FAA Will Implement The Las Vegas Metroplex Project On Feb. 25, 2021

The comprehensive project will use satellite navigation to move air traffic more safely and efficiently through the area. New routes for McCarran International Airport, Henderson Executive Airport, and North Las Vegas Airport will be more direct, automatically separated from each other and have efficient climb and descent profiles. It is one of 11 Metroplex projects nationwide.

Community involvement was a critical part of the project’s environmental process. The FAA conducted a thorough environmental review and extensive public engagement for the project, including 11 public workshops in 2017 and 2019.The agency also held four public comment periods totaling more than 120 days, and evaluated and responded to more than 140 comments.

After the FAA implements the new procedures, some flight track dispersion will continue to occur as it does today. Additionally, air traffic controllers will continue to sometimes direct aircraft off published routes for safety or efficiency or to reroute them around weather systems.

The FAA issued the Finding of No Significant Impact-Record of Decision (FONSI-ROD) for the Las Vegas Metroplex project in July 2020. The agency’s initial plan to implement the new routes in November 2020 was delayed by the COVID-19 public health emergency.

After issuing the FONSI-ROD, the FAA made minor adjustments to five procedures that are part of the project. The agency conducted a thorough review of the changes and confirmed they did not warrant a supplement to the final Environmental Assessment, consistent with FAA environmental policy. 

The Las Vegas Metroplex environmental website includes Google Earth features that enable the public to view historic and projected flight paths associated with the project, as well as the noise analysis the FAA conducted at more than 172,000 grid points throughout the projected General Study Area.

FMI: www.faa.gov

Advertisement

More News

NTSB Final Report: Piper PA-44-180

While On The Base Leg Of The Airport Traffic Pattern The Right Main Landing Gear Did Not Fully Extend Analysis: Both pilots reported that after performing airwork they returned to >[...]

Classic Aero-TV: The Bizarre Universe of Klyde Morris Cartoons

From 2023 (YouTube Edition): Putting the ANT in Antihero A Beech Starship speeds along at altitude. “Deflectors on!” a voice from within the aircraft cries. “Look>[...]

ANN's Daily Aero-Term (11.09.25): Minimum Friction Level

Minimum Friction Level The friction level specified in AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces, that represents the m>[...]

Aero-News: Quote of the Day (11.09.25)

“Beginning this aircraft subsystem testing is the culmination of more than a decade of focused engineering and certification refinements. This is the moment where our intende>[...]

Classic Aero-TV: Falling for Para-Phernalia’s Softie Emergency Parachutes

From 2023 (YouTube Edition): The Best Option for A Pilots’ Worst Days Since its 1979 founding, Para-Phernalia, Inc. has designed and manufactured the Softie line of pilot eme>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC