AD: Honeywell International Inc. Turboprop And Turboshaft Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.08.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Thu, Sep 20, 2018

AD: Honeywell International Inc. Turboprop And Turboshaft Engines

AD NUMBER: 2018-17-15

PRODUCT: Certain Honeywell International Inc. (Honeywell) TPE331 turboprop and TSE331 turboshaft engines. AD 2018-02-14 required inspection of the affected combustion chamber case assembly, replacement of those assemblies found cracked, and removal of affected assemblies on certain TPE331 and TSE331 engines.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2018-02-14 for the engines listed above.

This AD retains the inspection and replacement requirements in AD 2018-02-04; revises the Applicability to add the TPE331-12 engine model and the related inspection action, correct references to certain engine models; and revises compliance to allow certain weld repair procedures.

This AD was prompted by comments to revise the applicability and required actions of AD 2018-02- 14 to include the TPE331-12B engine model, correct certain TPE engine model typographical errors, and to allow certain weld repair procedures.

DATES: This AD is effective October 22, 2018.

COST: The FAA estimates  that this AD affects 5,644 engines installed on airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • On-wing inspection - 1 work-hour × $85 per hour = $85 per inspection
  • Replacement of the combustion chamber case assembly (if necessary) - 1 work-hour × $85 per hour = $85. Parts - $15,000. Total cost per operator $15,085 per aircraft.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (09.10.25): Runway Entrance Lights (REL)

Runway Entrance Lights (REL) An array of red lights which include the first light at the hold line followed by a series of evenly spaced lights to the runway edge aligned with the >[...]

Airborne 09.04.25: Textron Nixes EPlane, Space Command!, CO MidAir

Also: Daher Climate Policy, Boeing Reveal, Another Laser Whacko, Spirit Proceeds Textron eAviation is putting the development of its Nexus eVTOL aircraft on hold, meaning its first>[...]

Airborne Affordable Flyers 09.11.25: MWAE25, Tests-Flt Design F2, Vashon Ranger

Also: SUN ‘n FUN’s EarlyBird, Rotax Advanced Start, Girls in Aviation Day, Lockwood RV-916! The recently concluded Midwest Aviation Expo, hosted by the Mt. Vernon Outla>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

Airborne 09.08.25: Swift Fuel Approval, ‘Diamond Lil’ Roars, SnF26 Tkts On Sale!

Also: Carrier Landings Not Required, UAL To Tel Aviv, ATC in College, EMAS Systems Stop 2 Swift Fuels 100R unleaded fuel has earned ASTM production specification approval. This 100>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC