NATCA Lauds ASDE-X Commissionings At O'Hare, Charlotte | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Tue, Aug 14, 2007

NATCA Lauds ASDE-X Commissionings At O'Hare, Charlotte

Uses Surface Radar, ADS-B To Display Ground Ops

The National Air Traffic Controllers Association tells ANN it is looking forward to the commissioning of two sites this month for the Airport Surface Detection Equipment – Model X (ASDE-X) system, which the union says is very effective in helping controllers prevent runway incursions. ASDE-X will upgrade the ground radar systems at Chicago O’Hare and Charlotte Douglas International Airport. 

ASDE-X uses a combination of surface movement radar, transponder multilateration and ADS-B (Automatic Dependent Surveillance Broadcast) sensors to provide air traffic controllers with an accurate picture of the location and identity of aircraft and vehicles on the airport surface.

Ben Murray, NATCA Facility Representative at Charlotte Tower, feels the system installation has proceeded very well with just a few issues which are common with this type of complex deployment. The updated system will provide Charlotte controllers with information which may reduce departure delays and enable controllers to more safely and efficiently manage movement on the airport surface.

"NATCA supports the modernization of the air traffic control system and the ASDE-X program," NATCA President Patrick Forrey said. "This type of technology is an example of using new technology to assist the air traffic controllers working in control towers along with providing more information to the controller without increased workload. 

"Controllers were active in the initial development of the ASDE-X system and through coordination with the prime contractor, Sensis Corporation, have continued their efforts to see this project to completion. Sensis rightly has recognized that no system like this can be successful unless those that will use it -- the air traffic controllers -- are included in the process of making sure it is safe and works correctly and we thank them for including us in this partnership."

Fort Lauderdale International Airport is scheduled for delivery of ASDE-X in October.

FMI: www.natca.org, www.faa.gov, www.sensis.com/docs/128/

Advertisement

More News

Classic Aero-TV: UAvionix - Transitioning Between Manned & Unmanned Technologies

From 2017 (YouTube Edition): ADS-B For Airplanes And Drones… ADS-B technology developed by uAvionix has come full circle. The company began with a device developed for manne>[...]

ANN's Daily Aero-Term (09.14.25): Dead Reckoning

Dead Reckoning Dead reckoning, as applied to flying, is the navigation of an airplane solely by means of computations based on airspeed, course, heading, wind direction, and speed,>[...]

Aero-News: Quote of the Day (09.14.25)

"The next great technological revolution in aviation is here. The United States will lead the way, and doing so will cement America’s status as a global leader in transportat>[...]

ANN's Daily Aero-Linx (09.14.25)

Aero Linx: The Mooney Mite Site Dedicated to the Mooney M-18 Mite, "The Most Personal Airplane," and to supporting Mite owners everywhere. The Mooney M-18 Mite is a single-place, l>[...]

Airborne-NextGen 09.09.25: Textron Nixes ePlane, Joby L/D Flt, Swift Approval

Also: Space Command Moves, Alpine Eagle, Duffy Names Amit Kshatriya, Sikorsky-CAL FIRE Collab Textron eAviation is putting the development of its Nexus electric vertical takeoff an>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC