FAA Discusses 737 MAX Certification Flights | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.27.25

AirborneNextGen-
10.28.25

Airborne-Unlimited-10.29.25

Airborne-Unlimited-10.30.25

AirborneUnlimited-10.17.25

Sat, Jul 04, 2020

FAA Discusses 737 MAX Certification Flights

"The Agency Is Following A Deliberate Process"

The FAA and Boeing noted that they have completed the certification flight tests on the Boeing 737 MAX. During three days of testing this past week, FAA pilots and engineers evaluated Boeing’s proposed changes in connection with the automated flight control system on the aircraft.

While completion of the flights is an important milestone, a number of key tasks remain, including evaluating the data gathered during these flights. The agency is following a deliberate process and will take the time it needs to thoroughly review Boeing’s work. We will lift the grounding order only after FAA safety experts are satisfied that the aircraft meets certification standards.

The remaining tasks include:

  • JOEB Validation & FSB Review – The FAA’s Flight Standardization Board (FSB) and the Joint Operations Evaluation Board (JOEB) which includes international partners from Canada, Europe, and Brazil will evaluate minimum pilot training requirements. The FSB will issue a draft report for public comment addressing the findings of the FSB and JOEB.
  • Final FSB Report – The FAA will publish a final FSB report after reviewing and addressing public comments.
  • Final Design Documentation and TAB Report – The FAA will review Boeing’s final design documentation in order to evaluate compliance with all FAA regulations. The multi-agency Technical Advisory Board (TAB) will also review the final Boeing submission and issue a final report prior to a final determination of compliance by the FAA.
  • CANIC & AD – The FAA will issue a Continued Airworthiness Notification to the International Community (CANIC) providing notice of pending significant safety actions and will publish an Airworthiness Directive (AD) that addresses the known issues for grounding. The AD will advise operators of required corrective actions before aircraft may re-enter commercial service.
  • FAA Rescinds Grounding Order – This marks the official ungrounding of the aircraft, pending completion by operators of the work specified in the AD, along with any required training.
  • Certificates of Airworthiness – The FAA will retain its authority to issue airworthiness certificates and export certificates for all new 737 MAX airplanes manufactured since the grounding. The FAA will perform in-person, individual reviews of these aircraft.
  • Operator Training Programs – The FAA will review and approve training programs for all part 121 operators.
FMI: www.faa.gov

 


Advertisement

More News

A ‘Crazy’ Tesla Flying Car is Coming

Musk Claims the Tech Could Be Unveiled Within a Couple of Months Elon Musk is once again promising the impossible…this time, in the form of a Tesla that flies. Speaking on T>[...]

ANN's Daily Aero-Term (11.xx.25): NonApproach Control Tower

NonApproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]

Aero-News: Quote of the Day (11.01.25)

"It was pretty dang cool to be in a tube-and-fabric bush plane that high, and it was surreal hearing airline pilots over ATC wondering what a Cub was doing up there. The UL is trul>[...]

ANN's Daily Aero-Linx (11.01.25)

Aero Linx: Lake Amphibian Club Over the years the cost of a new Skimmer or Lake went from about $16,000 to over $500,000 for many reasons. Sales of Renegades have been very sparse >[...]

Classic Aero-TV: EAA Introduces Angle of Attack Training

From 2024 (YouTube Edition): Clinic Aimed to Promote Safe Aircraft Control The EAA Pilot Proficiency Center hosted an angle of attack (AOA) training clinic during the 2024 Oshkosh >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC