NATCA: Runway Safety Technology Deployment At Risk | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Fri, Sep 24, 2004

NATCA: Runway Safety Technology Deployment At Risk

Controllers Union Blames "FAA'S Short-Sighted Budget Cuts"

From NATCA...

Turning a blind eye to one of its very own performance goals, the Federal Aviation Administration is dramatically slowing the deployment of a key piece of equipment designed to reduce the threat of runway accidents, providing more proof that the agency's haphazard cuts to its modernization budget are affecting aviation safety.

The equipment, Airport Surface Detection Equipment-Model X (ASDE-X), provides air traffic controllers with an all-weather, seamless airport surface surveillance system that uses both radar and a process of determining a target location in two or three dimensions called multilateration.

The ASDE-X program was originally scheduled to be completed in 2007, but due to FAA budgetary decisions, only 15 of the scheduled 34 sites will have received ASDE-X by then. In the next fiscal year, only two airports will receive ASDE-X; Houston Hobby and Charlotte Douglas International, while only three sites will have it in fiscal year 2006 and five others in fiscal year 2007.

"We have a tool designed to aid the air traffic controller in reducing the threat of runway accidents and the FAA has a goal to reduce serious runway incursions. The FAA and NATCA agree that ASDE-X would be of great benefit to the safety of the aviation industry, yet at the same time, the budget and deployment of this tool is threatened," National Air Traffic Controllers Association Director of Safety and Technology Doug Fralick said. "This just does not make any sense whatsoever."

In addition, the majority of the ASDE-X installations and testing dates have been pushed back to 2008 and 2009 when there is no funding allocated for fielding this equipment. As it is, the program has had its budget cut $20.2 million for fiscal year 2004 and fiscal year 2005.

"It's been nearly a decade since NATCA proposed the idea of a low-cost surface surveillance system for mid-size airports. This idea evolved into incorporating the data from the runway safety technology already in place at 34 larger airports," Fralick said. "Considering that runway incursions remain one of the National Transportation Safety Board's most important concerns and are keeping the FAA from achieving all of its safety performance goals, the last thing the FAA should do is turn its back on ASDE-X and miss a crucial opportunity to seriously tackle the issue of runway safety."

Despite frequent assurances to NATCA that all sites on the original ASDE-X deployment plan would be funded, two in fact, Reno/Tahoe International Airport and San Juan-Luis Munoz Marin International Airport, have no funding. In order to receive the ASDE-X systems they were promised, these two airport authorities will have to apply for Airport Improvement Program funding and pay 25 percent of the cost themselves.

FMI: www.natca.org

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC