Analyst Calls Boeing's Dreamliner Goal 'Near-Herculean' | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.20.25

AirborneNextGen-
10.21.25

Airborne-Unlimited-10.22.25

Airborne-FltTraining-10.23.25

AirborneUnlimited-10.17.25

Thu, Nov 15, 2007

Analyst Calls Boeing's Dreamliner Goal 'Near-Herculean'

Has Doubts Planemaker Will Be Able To Build Over 100 Planes By 2010

Financial consultants aren't typically prone to hyperbole... which makes statements by an analyst with Bear Sterns, on Boeing's stated goal to build more than 100 787 Dreamliners in two years, all the more compelling.

Analyst Steve Binder says he has his doubts Boeing will be able to stick to its ambitious goals -- especially given the planemaker hasn't flown the first Dreamliner yet, and announced delays in initial production last month.

"Reaching the planned monthly production rates to achieve 109 deliveries by the end of 2009 is still a near-Herculean task, in our view," said Binder, shortly after a meeting with Boeing management to get an update on the 787 program.

Despite that less-than-optimistic summation, however, Binder adds Boeing "shares still offer a relatively attractive risk-reward profile over the next six months," despite the risk of further delays keeping the lid on likely yields below 15 percent.

After seeing a strong rise in share value over the past 18 months, Boeing's shares have since dropped off 13% since the beginning of October, ahead of the planemaker's October 10 announcement of a six-month delay in development and first deliveries of the composite-bodied 787.

Despite the delay, for the moment Boeing says it will still produce 109 Dreamliners by the end of 2009 -- only three less than it had originally planned in the same period.

We dunno... "near-Herculean" may not even cover it...

FMI: www.boeing.com, www.bearsterns.com

Advertisement

More News

Affordable Flying Expo Announces Industry MOSAIC Town Hall

Scheduled for Friday, November 7th at 1800ET, The MOSAIC Town Hall, Webcast At www.airborne-live.net One of the more intriguing features of the 2025 Affordable Flying Expo, schedul>[...]

Classic Aero-TV: Composite-FX Sets Elevates the Personal Helicopter Market

From 2023 (YouTube Edition): The Mosquito Evolves Formerly known as Mosquito, Trenton, Florida-based Composite FX is a designer and manufacturer of personal kit and factory-finishe>[...]

Aero-News: Quote of the Day (10.25.25)

“The Board is pleased to name Lisa as our next CEO after conducting a comprehensive succession planning process and believes this transition will ensure continued success for>[...]

ANN's Daily Aero-Term (10.25.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

NTSB Final Report: Gallow Daniel A Kitfox Classic IV

The Airplane Stalled Above The Runway Threshold, The Nose Dropped, The Nose Wheel Impacted The Runway, And The Airplane Flipped Over Analysis: The pilot reported that during the fi>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC