Rockwell Collins To Activate P-8A Radio Components Depot Capability | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Nov 24, 2016

Rockwell Collins To Activate P-8A Radio Components Depot Capability

Partnership Allows For Streamlined Service And Support

The U.S. Navy has awarded $27 million contract to Rockwell Collins to activate a depot capability for the U.S. Navy P-8A Poseidon aircraft HF-121C and miscellaneous radio components. Under contract through 2020, establishing this depot capability creates military jobs, reduces the repair pipeline and improves availability of aircraft.

“Establishing a depot capability allows our customers to service their own equipment and shorten turnaround time,” said Thierry Tosi, vice president and general manager, Service Solutions for Rockwell Collins. “In addition, the capability allows for enhanced mission readiness and support to the warfighter.”

Delivered in a three-phased approach, the P-8A Poseidon radio component depot capability initially began with an assessment to determine the necessary requirements. The partnership is currently in an activation stage, or the second phase, which involves the knowledge and tools transfer to support the radio components to U.S. Navy personnel. Phase three involves a sustainment plan and likely a public-private partnership.

The HF-121C airborne high frequency (HF) communication system is designed for HF applications requiring voice and data operations at 400W transmit power. The HF-121C and other radio components provide maximum performance to the P-8A Poseidon, allowing for fast and secure data transfer, making it a critical onboard capability.

Work will be performed at the Naval Air Station's Fleet Readiness Center Southwest in North Island, CA.

(Image provided with Rockwell Collins news release)

FMI: www.rockwellcollins.com, www.navy.mil

Advertisement

More News

ANN's Daily Aero-Linx (12.03.25)

Aero Linx: American Aviation Historical Society AAHS is dedicated to the preservation and dissemination of the rich heritage of American aviation. Our purpose is to collect, preser>[...]

ANN's Daily Aero-Term (12.03.25): CrewMember (UAS)

CrewMember (UAS) A person assigned to perform an operational duty. A UAS crewmember includes the remote pilot in command, the person manipulating the controls, and visual observers>[...]

NTSB Prelim: Maule M-7-235A

Immediately After The Right Main Tire Contacted The Runway Surface, The Right Main Landing Gear Failed On October 31, 2025, at about 1227 Pacific daylight time, a Maule M-7-235A, N>[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

Aero-News: Quote of the Day (12.04.25)

"On December 3, 2025, at approximately 10:45 a.m., a Thunderbird pilot ejected safely from a F-16C Fighting Falcon aircraft during a training mission over controlled airspace in Ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC