Boeing Submits Proposals For Ares V Design Support | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Thu, Feb 19, 2009

Boeing Submits Proposals For Ares V Design Support

Includes Bids For Payload Shroud, Departure Stage, And Avionics

Boeing announced this week its Space Exploration division recently submitted a slew of proposals to NASA for the Ares V Phase 1 Design Support Contracts.

Boeing submitted proposals for design support of the Ares V cargo launch vehicle's payload shroud, which will protect the Altair lunar lander during launch; the Earth-departure stage; the core stage, a liquid-fueled central booster element; and avionics and software. The work includes assessing requirements, risks and opportunities; performing trade studies and analysis; and producing final reports.

The company proposes to use the experience of its Huntsville-based team, supplemented by expertise from across Boeing, to develop products that will enable NASA to verify the Ares V design concept and demonstrate that the launch vehicle can meet its mission objectives.

"Boeing has designed and produced shrouds for Delta, Sea Launch and Titan rockets, and we've defined avionics and subsystem architectures across a wide range of aerospace products, including Delta, the space shuttle, the International Space Station and Ares I," said Jim Chilton, Boeing vice president of Exploration Launch Systems. "We're pleased to have the chance to bring this experience to NASA and Ares V."

The two-stage, vertically stacked Ares V will serve as NASA's primary rocket for delivery of large-scale hardware to space -- from the lunar landing craft and materials for establishing a moon base to food, water and other staples needed to extend a human presence beyond Earth's orbit.

The Ares V Phase 1 contracts will be managed out of NASA's Marshall Space Flight Center in Huntsville, AL.

FMI: www.boeing.com

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC