Navy, Northrop Grumman Complete Software Configuration Design Review | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, Nov 14, 2024

Navy, Northrop Grumman Complete Software Configuration Design Review

Improves E-2D Advanced Hawkeye Situational Awareness And More

The U.S. Navy’s fleet of Northrop Grumman E-2D Advanced Hawkeye aircraft are one stop closer to significant operational improvements following the recent completion of the E-2D Advanced Hawkeye Delta System Software Configuration (DSSC)-6 Preliminary Design Review (PDR).

The new configuration reduces pilot workload while improving situational awareness and enhancing readiness. It provides reliability as well as architecture and cybersecurity upgrades.

The Technical Review Board who assessed the PDR said that the DSSC-6 team is “leading Naval Aviation” by taking advantage of digital engineering to transform the E-2D platform. The next step will be a detailed design phase scheduled for 2025.

Lt. Cmdr. Neil Whitesell, PMA-231 Level 2 Program Manager for DSSC-6 commented, “Successful completion of the E-2D DSSC-6 PDR is an affirmation of the ground-breaking work undertaken by the combined PMA-231 and NGC teams.

It represents a major programmatic milestone in the acquisition of technology key to maintaining carrier-based airborne command and control dominance well into the next decade.”

These upgrades will provide avionics infrastructure improvements to flight and mission systems. They increase crew effectiveness, address parts obsolescence, add improved computing and electronic storage, improve connectivity for command and control, and create a modular open systems environment for the insertion of future technology.

The first test flight of an E-2D with this configuration is scheduled for fiscal 2027 and operational capability in fiscal 2030.

FMI:  www.navair.navy.mil/

 


Advertisement

More News

NTSB Final Report: Douglas A-4K

Pilot Applied Full Aft Stick And Nose-Up Trim, But The Airplane Remained On The Runway Analysis: The pilot reported that a preflight inspection and flight control checks revealed n>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: PBY Catalina--From Wartime to Double Sunrise to the Long Sunset

From 2022 (YouTube Edition): Before They’re All Gone... Humankind has been messing about in airplanes for almost 120-years. In that time, thousands of aircraft representing i>[...]

ANN's Daily Aero-Term (07.01.25): Advanced Air Mobility (AAM)

Advanced Air Mobility (AAM) A transportation system that transports people and property by air between two points in the NAS using aircraft with advanced technologies, including el>[...]

ANN's Daily Aero-Linx (07.01.25)

Aero Linx: MQ-1B Predator The MQ-1B Predator is an armed, multi-mission, medium-altitude, long-endurance remotely piloted aircraft that is employed primarily as an intelligence-col>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC