Boeing Begins Final Assembly Of First 787-10 Dreamliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Dec 09, 2016

Boeing Begins Final Assembly Of First 787-10 Dreamliner

First Test Airplane Enters Its Next Phase Of Production

Final assembly of the first Boeing 787-10 Dreamliner is underway at the company's North Charleston, SC campus.

The first 787-10 will cycle through Boeing South Carolina's Final Assembly facility as all major sections are joined, interior and exterior components completed, power turned on and production tests begin.

"As we enter the next phase of the 787-10's development, we eagerly watch our first airplane come to life," said Ken Sanger, vice president and general manager, 787 Airplane Development, Boeing Commercial Airplanes. "This is the result of years of preparation and solid performance by our Boeing teammates and supplier partners. This achievement is another example that demonstrates Boeing's ability to develop great airplanes in a disciplined fashion in order to meet our customer commitments."

The first 787-10 is expected to fly in 2017 and first delivery is scheduled for 2018.

The 787-10 is the third member of the super-efficient, passenger-pleasing 787 Dreamliner family. As a stretch of the 787-9, the 787-10 will retain 95 percent commonality while adding seats and cargo capacity, setting a new benchmark for fuel efficiency and operating economics – 25 percent better fuel per seat and emissions than the airplanes it will replace.

To date, Boeing has received 154 787-10 orders from nine customers.

(Source: Boeing news release. Image from file)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC