ACI-NA Supports 'Hard Deadline' For Deplaning Delayed Airline Passengers | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, Sep 24, 2009

ACI-NA Supports 'Hard Deadline' For Deplaning Delayed Airline Passengers

Urges DOT Requirement Regardless Of Aircraft Size

As consumer groups and travel industry organizations convene a Washington forum on air passenger rights, Greg Principato, president of Airports Council International-North America, offered the following industry perspective on passenger rights and protections on Tuesday:

"Airline passengers should have the right to deplane after an extended amount of delay on a runway, and ACI-NA supports a requirement for airlines to develop such  deadlines."

"ACI-NA supports airlines working with the U.S. Congress and the U.S. DOT to determine specific deadlines, and airport operators believe that passengers should have access to this information when making their travel plans. Airlines also should be held accountable for adhering to the pre-determined deadlines."

Principato noted that airport operators have been supporting passengers on this issue, urging DOT to require all airlines - regardless of the size of their aircraft -  to develop contingency plans which are incorporated into their contract of carriage.  Also, given the important role of airports during lengthy tarmac delays, ACI-NA strongly supports adoption of a mandate that airlines be required to coordinate their plans with all airports at which they provide scheduled or charter service.  

ACI-NA has long been active on airline passenger rights, facilities and finances. In 2008, ACI-NA participated in a DOT national task force of airlines, airports and the FAA to develop contingency plans to address delays. The Task Force successfully produced a plan that addresses several issues raised by industry and passenger advocates, Principato said. A number of airports already had implemented measures in the plan.  ACI-NA also filed comments with DOT supporting enhanced protections for passengers, such as increased compensation for delayed or cancelled flights and lost baggage.

FMI: www.aci-na.org

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

ANN's Daily Aero-Linx (07.03.25)

Aero Linx: Colorado Pilots Association (CPA) Colorado Pilots Association was incorporated as a Colorado Nonprofit Corporation in 1972. It is a statewide organization with over 700 >[...]

ANN's Daily Aero-Term (07.03.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC