AD: Bombardier, Inc., Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Fri, Feb 28, 2020

AD: Bombardier, Inc., Airplanes

AD NUMBER: 2020-03-21

PRODUCT: Certain Bombardier, Inc., Model BD-700-1A10 and BD-700-1A11 airplanes.

ACTION: Final rule; request for comments.

SUMMARY:  This AD was prompted by reports that main landing gear (MLG) trailing arm assemblies were found with compromised paint finish and corrosion on the axle bore inner diameters due to improper removal of contaminants during manufacturing.

This AD requires a one-time inspection to determine if an affected MLG trailing arm assembly is installed, repetitive detailed inspections of the inner diameter of the affected MLG trailing arm assembly axle bore for surface finish discrepancies, corrective actions if necessary, and eventual replacement of primer and paint and application of corrosion preventive compound on the inner diameter of all affected MLG trailing arm assembly axle bores, which terminates the repetitive inspections.

DATES: This AD becomes effective March 12, 2020. The FAA must receive comments on this AD by April 13, 2020.

COST: The FAA estimates that this AD affects 49 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

Required Actions

  • Labor: Up to 33 work-hours × $85 per hour = Up to $2,805.
  • Parts: Up to $200,000.
  • Cost per airplane: Up to $202,805.

On Condition Costs

  • Labor: Up to 20 work-hours × $85 per hour = Up to $1,700.
  • Parts: Up to $200,000.
  • Cost per airplane: Up to $201,700.

According to the manufacturer, some or all of the costs of this AD may be covered under warranty, thereby reducing the cost impact on affected individuals.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (05.06.25)

Aero Linx: International Federation of Airworthiness (IFA) We aim to be the most internationally respected independent authority on the subject of Airworthiness. IFA uniquely combi>[...]

ANN's Daily Aero-Term (05.06.25): Ultrahigh Frequency (UHF)

Ultrahigh Frequency (UHF) The frequency band between 300 and 3,000 MHz. The bank of radio frequencies used for military air/ground voice communications. In some instances this may >[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: Virtual Reality Painting--PPG Leverages Technology for Training

From 2019 (YouTube Edition): Learning To Paint Without Getting Any On Your Hands PPG's Aerospace Coatings Academy is a tool designed to teach everything one needs to know about all>[...]

Airborne 05.02.25: Joby Crewed Milestone, Diamond Club, Canadian Pilot Insurance

Also: Sustainable Aircraft Test Put Aside, More Falcon 9 Ops, Wyoming ANG Rescue, Oreo Cookie Into Orbit Joby Aviation has reason to celebrate, recently completing its first full t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC