AD: The Boeing Company | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Sat, Jan 21, 2012

AD: The Boeing Company

AD NUMBER: 2011-25-05

PRODUCT: Boeing Model 767 airplanes
SUBJECT: Airworthiness Directive 2011-25-05
ACTION: Final rule

SUMMARY: This AD requires installing new panel assemblies in the main equipment center or on the forward cargo compartment sidewall and removing certain relays from some panels in the main equipment center. This AD also requires revising the maintenance program to incorporate Airworthiness Limitations (AWLs) No. 28-AWL-27 and No. 28-AWL-28. This AD also includes an alternative location for the installation of the new panel assemblies for airplanes that have the optional water system drain plumbing and changing the interconnecting wiring between the P141 panel and the P36 and P37 panels.

For airplanes with a deactivated center fuel tank, this AD also requires an alternative functional test for the left and right override/jettison pumps.

The FAA is issuing this AD to prevent possible sources of ignition in a fuel tank caused by electrical fault or uncommanded dry operation of the main tank boost pumps and center auxiliary tank override and jettison pumps.

This AD was prompted by fuel system reviews conducted by the manufacturer. An ignition source in the fuel tank could result in a fire or an explosion and consequent loss of the airplane.

DATES: This AD is effective February 22, 2012.

FMI: AD

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC