Boeing Rolls Out First 787 At Increased Production Rate | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Fri, May 10, 2013

Boeing Rolls Out First 787 At Increased Production Rate

100th Airplane To Be Built At The Company's Everett, WA, Factory

Boeing has rolled out of the factory the first 787 Dreamliner to be built at the increased production rate of seven airplanes per month. The airplane, which rolled out earlier this week, is the 114th 787 to be built overall and the 100th 787 to be built at the Everett, WA, factory.

Boeing says its 787 program is on track to achieve a planned 10 per month rate by year-end. Just six months ago, the company announced that it would be increasing the number of Dreamliners coming off its assembly lines to five per month. "This accomplishment, doubling our production rate in one year, is the result of the combined efforts of thousands of men and women across Boeing and at our partners," Larry Loftis, vice president and general manager of the 787 program, said at the time. "The entire 787 team is focused on meeting our commitments. They've gotten even smarter in how they build this airplane and applied real ingenuity in making our processes and tools more efficient."

The production rate accounts for airplanes built at the Everett Final Assembly facility, the Everett Temporary Surge Line and Boeing South Carolina. To date, 50 787s have been delivered to eight airlines. The program has more than 800 unfilled orders with 58 customers worldwide.

(Images provided by Boeing)

FMI: www.boeing.com


Advertisement

More News

NTSB Final Report: Cory Green Kitfox Series 7 STI

Pilot’s Failure To Maintain Directional Control During Takeoff Analysis: The flight instructor reported that he and the pilot receiving instruction were practicing takeoffs a>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

ANN's Daily Aero-Linx (07.30.25)

Aero Linx: Guild of Air Traffic Control Officers (GATCO) GATCO is the professional body which represents the professional interests and opinions of those in the UK Air Traffic Mana>[...]

ANN's Daily Aero-Term (07.30.25): Primary Radar

Primary Radar A radar system in which a minute portion of a radio pulse transmitted from a site is reflected by an object and then received back at that site for processing and dis>[...]

Aero-News: Quote of the Day (07.31.25)

“There is never a shortage of ideas from EAA members, AirVenture attendees, our partners, and from inside our own volunteer corps and staff. We’ll take a little time to>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC