Left Behind: A MUCH Improved Hubble | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, May 20, 2009

Left Behind: A MUCH Improved Hubble

The crew of Atlantis bid farewell to the Hubble Space Telescope on behalf of NASA and the rest of the world Tuesday. The telescope was released back into space at 8:57 a.m. EDT. With its upgrades, the telescope should be able to see farther into the universe than ever before.

Astronaut Megan McArthur used the shuttle’s robotic arm to grab Hubble, lift it out of Atlantis’ payload bay and release it. Ground teams opened Hubble’s aperture door, which is the large shutter that protects the telescope’s primary and secondary mirrors.

Atlantis performed a final separation maneuver from the telescope at 9:28 a.m., which took the shuttle out of the vicinity of Hubble. The berthing mechanism to which Hubble has been attached during the mission was stored back down into the payload bay.

The rest of the day was focused on the scheduled inspection of Atlantis’ heat shield, searching for any potential damage from orbital debris. The crew used the shuttle robotic arm to operate the Orbiter Boom Sensor System (OBSS) for the inspection. The crew worked ahead of schedule and returned the OBSS to the payload bay sill Tuesday instead of Wednesday.

The crew’s sleep period is being modified to allow them to go to sleep 30 minutes early to help adjust for an earlier workday for the rest of the mission. The adjusted schedule allows the entry flight control team to consider an earlier landing opportunity at NASA’s Kennedy Space Center, Friday, before the sea breeze adversely affects landing weather conditions later in the day.

FMI: www.nasa.gov

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC