AD: Mitsubishi Heavy Industries, Ltd. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Wed, Dec 30, 2020

AD: Mitsubishi Heavy Industries, Ltd. Airplanes

AD 2020-26-14 Requires Modification And Repetitive Inspections Of The PPC Lever Linkage

The FAA is superseding Airworthiness Directive (AD) 75-16-20, which applied to all Mitsubishi Heavy Industries, Ltd., Model MU-2B, MU-2B-10, MU-2B-15, MU-2B-20, MU-2B-25, MU-2B-26, MU-2B-30, MU-2B-35, and MU-2B-36 airplanes.

AD 75-16-20 required repetitive inspections of the propeller pitch control (PPC) lever for security and proper rigging. This AD requires modification and repetitive inspections of the PPC lever linkage. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective February 2, 2021.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to supersede AD 75-16-20, Amendment 39-2294 (40 FR 31751, July 29, 1975) (AD 75-16-20). AD 75-16-20 applied to all Mitsubishi Heavy Industries, Ltd. (Mitsubishi) Models MU-2B, MU-2B-10, MU-2B-15, MU-2B-20, MU-2B-25, MU-2B-26, MU-2B-30, MU-2B-35, and MU-2B-36 airplanes. The NPRM published in the Federal Register on August 25, 2020 (85 FR 52281). The NPRM was prompted by reports of the PPC lever linkages disconnecting at the engine and Mitsubishi developing a secondary retention feature to secure the PPC. The NPRM was also prompted by Mitsubishi type certificating additional airplanes that are subject to the unsafe condition. In the NPRM, the FAA proposed to require installation of the secondary retention feature, repetitive inspections of the PPC lever linkage, and reporting inspection results to the FAA.

FMI: www.regulations.gov

Advertisement

More News

Airborne 07.21.25: Nighthawk!, Hartzell Expands, Deltahawk 350HP!

Also: New Lakeland Fly-in!, Gleim's DPE, MOSAIC! Nearly three-quarters of a century in the making, EAA is excited about the future… especially with the potential of a MOSAIC>[...]

ANN's Daily Aero-Term (07.27.25): Estimated (EST)

Estimated (EST) -When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the >[...]

ANN's Daily Aero-Linx (07.27.25)

Aero Linx: Regional Airline Association (RAA) Regional airlines provide critical links connecting communities throughout North America to the national and international air transpo>[...]

NTSB Final Report: Luce Buttercup

The Airplane Broke Up In Flight And Descended To The Ground. The Debris Path Extended For About 1,435 Ft. Analysis: The pilot, who was the owner and builder of the experimental, am>[...]

Classic Aero-TV: 'That's All Brother'-Restoring a True Piece of Military History

From 2015 (YouTube version): History Comes Alive Thanks to A Magnificent CAF Effort The story of the Douglas C-47 named, “That’s all Brother,” is fascinating from>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC