Bell Completes V-22 Osprey Improvements | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Jan 28, 2022

Bell Completes V-22 Osprey Improvements

Simplified, Streamlined Nacelle Changes Speed Maintenance Process, Reduce Costs

The V-22 Osprey has seen the first of the fleet's upcoming enhancements under the Nacelle Improvements Modification program.

Bell and Boeing have sought to reduce costs and maintenance time by refining wiring and access components within the engine nacelle. The fix has intruiged other domestic operators of the aircraft type, with the Marine Corps and Navy citing interest in acquiring the same nacelle improvements for their MV-22 and CMV-22B variants. 

The housings contain the Osprey's most critical power components, requiring constant attention and inspection to the derision of technicians on base. The program will ultimately save time and cost while boosting mission readiness rates. Bell completed the first modification on an Air Force CV-22 Osprey taken from the 20th Special Operations Squadron at Cannon Air Force Base at their Amarillo, Texas Assembly Center. The facility employs more than 500 to offer simultaneous production of new Ospreys as well as overhauls to existing aircraft.

The experienced "Bell artisans" are said to make short work of the nacelle removal and replacement process, further saving time for aircraft needed back in service as quickly as possible. The first completed Osprey was returned to service soon after, with the second to be completed currently underway. 

“Speed, range, and versatility have always been fundamental to the Osprey, and that includes speed of maintenance,” said Kurt Fuller, V-22 program director and Bell vice president. "The incorporated nacelle improvements help ensure the Osprey continues to outpace adversaries both operationally and sustainably.”

FMI: www.textron.com

Advertisement

More News

ANN's Daily Aero-Term (12.08.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (12.08.25)

Aero Linx: T-34 Association, Inc. The T-34 Association was formed in July 1975 so that individuals purchasing then military surplus T-34As had an organization which would provide s>[...]

NTSB Final Report: Piper PA-31T3

As He Released The Brakes To Begin Taxiing, The Brake Pedals Went To The Floor With No Braking Action Analysis: The pilot reported that during engine start up, he applied the brake>[...]

Aero-News: Quote of the Day (12.08.25)

“Legislation like the Mental Health in Aviation Act is still imperative to hold the FAA accountable for the changes they clearly acknowledge need to be made... We cannot wait>[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC