ILS Concludes Its Review Of Centenario Proton Launch Failure Investigation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Thu, Aug 06, 2015

ILS Concludes Its Review Of Centenario Proton Launch Failure Investigation

Agree That Higher Than Expected Vibrations Led To The Loss Of The Spacecraft

The International Launch Services (ILS) Failure Review Oversight Board (FROB) has concluded its work associated with the May 16 Proton launch failure that led to the loss of a Centenario cargo vessel carrying supplies for the ISS.

The ILS concurred with the most probable cause and the associated corrective action plan which were identified by the Russian Interagency Commission (IAC) as a result of the May 16 Proton launch vehicle failure carrying the Centenario spacecraft.

The members of the FROB reviewed the findings and conclusions from the IAC along with results from testing and investigations that the IAC directed to be performed by Khrunichev and their subsidiaries.

Based on the data presented by KhSC, the FROB agreed that the most probable cause of the failure was a result of a higher than expected vibration environment most likely caused by the combination of a marginal mechanical joint used to mount the Stage III steering engine turbo pump and a steering engine turbopump rotor material that had marginal strength under maximum operating environments. This led to a premature shutdown of the turbopump and loss of Stage III control authority and subsequently to the failure of the mission during 3rd stage operation approximately 497 seconds after liftoff.

“The participating customers, insurance underwriters and independent subject matter experts are to be commended for their valuable contributions during the extensive FROB review process. We thank our customers for their support as we prepare for the safe return to flight of ILS Proton,” said ILS Vice President and Chief Technical Officer, John Palmé.

(Proton rocket launch image from file)

FMI: www.ilslaunch.com

Advertisement

More News

Airborne-NextGen 11.04.25: Anduril YFQ-44A, Merlin SOI 2, UAV Rulemaking Stalled

Also: Horizon Picks P&W PT6A, Army Buys 3 EagleNXT, First Hybrid-Electric Regional, Army Selects AEVEX Anduril Industries’ YFQ-44A Collaborative Combat Aircraft was flown>[...]

NTSB Prelim: Elmore Travis C Searey

While Flying North Along The Beach At About 300 Ft Above Ground Level, The Pilot Reported That The Engine RPM Dropped To About Idle On September 28, 2025, at 1126 eastern daylight >[...]

ANN's Daily Aero-Linx (11.03.25)

Aero Linx: European Association of Aviation Training and Educational Organisations (EATEO) Welcome to the “ European Association of Aviation Training and Education Organizati>[...]

ANN's Daily Aero-Term (11.03.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

Aero-News: Quote of the Day (11.03.25)

“It also gives us the hard data we need to shape requirements, reduce risk, and ensure the CCA program delivers combat capability on a pace and scale that keeps us ahead of t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC