USAF Moves Forward With Future Bomber | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Tue, Jul 15, 2014

USAF Moves Forward With Future Bomber

RFP Issued July 9, Contract Award Anticipated In Spring 2015

The U.S. Air Force released its Long Range Strike Bomber, or LRS-B, request for proposal July 9 with a contract award expected in spring 2015. The new bomber is a top modernization priority for the Air Force and will provide the United States with the option to hold any target at risk at any point around the world.

“The LRS-B will be an adaptable and highly-capable system based upon mature technology,” said Secretary of the Air Force Deborah Lee James. “We have established an achievable and stable set of requirements that should make this capability a hallmark for the future. We’ve set a realistic target cost for the system and have a procurement strategy which allows us to affordably field a new bomber fleet. The program’s strategy will ensure we get the best possible deal for the taxpayer.”

The new bomber will be a long-range, air-refuelable, highly survivable aircraft with significant nuclear and conventional stand-off and direct-attack weapons payload. The LRS-B will provide operational flexibility across a wide range of military operations.

"The long range strike bomber will be essential to our ability to win a full-spectrum conflict in the future. It is a must-have capability," said Air Force Chief of Staff General Mark Welsh.

The Air Force plans to purchase 80-100 LRS-B aircraft at a $550 million average unit procurement cost in base year 2010 dollars with an initial capability in the mid-2020s.

A request for proposal, or RFP, defines a future contract’s requirements and informs industry on how to respond in their proposals. Release of the RFP precedes competitive selection based on contractor proposals.

FMI: www.af.mil

Advertisement

More News

NTSB Prelim: Lee Aviation LLC JA30 SuperStol

A Puff Of Smoke Came Out From The Top Of The Engine Cowling Followed By A Total Loss Of Engine Power On May 9, 2025, about 1020 mountain daylight time, an experimental amateur-buil>[...]

Classic Aero-TV: Curtiss Jenny Build Wows AirVenture Crowds

From 2022 (YouTube Edition): Jenny, I’ve Got Your Number... Among the magnificent antique aircraft on display at EAA’s AirVenture 2022 was a 1918 Curtiss Jenny painstak>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Classic Aero-TV: Quest Kodiak Enhances Migration Monitoring Programs

From 2008 (YouTube Edition): US Fish and Wildlife Service Chooses The Kodiak To Monitor Waterfowl Populations Waterfowl all over North America may soon have to get used to a new ab>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC