NASA Mission To Test Einstein's Theory Headed For Vandenberg | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jul 12, 2003

NASA Mission To Test Einstein's Theory Headed For Vandenberg

Gravity Probe B To Test Effect Of Large Spatial Objects On Space, Time

The NASA spacecraft designed to test two important predictions included in Albert Einstein's Theory of General Relativity, headed from the Lockheed Martin Space Systems Facility in Sunnyvale (CA) to the launch site at Vandenberg Air Force Base, after completing environmental testing.

NASA's Gravity Probe B mission, also known as GP-B, will use four ultra-precise gyroscopes to test Einstein's theory that space and time are distorted by the presence of massive objects. To accomplish this, the mission will measure two factors -- how space and time are warped by the presence of the Earth, and how the Earth's rotation drags space-time around with it.

Stanford University in Stanford (CA) and Lockheed Martin performed the testing. Shipped by road transport, the vehicle arrived July 10 at Vandenberg for pre-launch operations in anticipation of liftoff later this year.

Was Einstein Right?

NASA's Marshall Space Flight Center in Huntsville (AL) manages the GP-B program. NASA's prime contractor for the mission, Stanford University, conceived the experiment and is responsible for the design and integration of the science instrument, as well as for mission operations and data analysis. Lockheed Martin, a major subcontractor, designed, integrated and tested the spacecraft and some of its major payload components.

The erection of the Boeing Delta II launch vehicle on Space Launch Complex 2 (SLC-2) at Vandenberg Air Force Base is currently scheduled to begin on September 15 with erection of the first stage.  Attachment of the nine strap-on solid rocket boosters is scheduled to occur in sets of three on September 16 - 18.  The second stage is planned for mating atop the first stage on September 19.  Gravity Probe B will be transported from the spacecraft hangar to SLC-2 on October 29 and hoisted atop the second stage. The Delta II fairing will be installed around the spacecraft on November 5, part of final pre-launch preparations.

FMI: http://nmsp.gsfc.nasa.gov

Advertisement

More News

NTSB Final Report: Patriot Aircraft LLC CX1900A

After Draining Both Wing Fuel Tanks, A Significant Amount Of Water Was Observed In The Right Wing Fuel Tank Analysis: The pilot, who was also the owner of the experimental amateur->[...]

Aero-News: Quote of the Day (12.06.25)

“Airbus apologises for any challenges and delays caused to passengers and airlines by this event. The Company thanks its customers, the authorities, its employees and all rel>[...]

ANN's Daily Aero-Term (12.06.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

ANN's Daily Aero-Linx (12.06.25)

Aero Linx: Taylorcraft Foundation, Inc. The Taylorcraft Foundation is exclusively organized for charitable, educational & scientific activities and will preserve the history an>[...]

Airborne-NextGen 12.02.25: Honda eVTOL, Arctus High-Alt UAS, Samson Patent

Also: USAF Reaper Accident, Baikonur Damage, Horizon eVTOL IFR/FIKI, New Glenn Update Honda has outlined its clearest timeline yet for its entry into the world of electric vertical>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC