NASA Mission To Test Einstein's Theory Headed For Vandenberg | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Sat, Jul 12, 2003

NASA Mission To Test Einstein's Theory Headed For Vandenberg

Gravity Probe B To Test Effect Of Large Spatial Objects On Space, Time

The NASA spacecraft designed to test two important predictions included in Albert Einstein's Theory of General Relativity, headed from the Lockheed Martin Space Systems Facility in Sunnyvale (CA) to the launch site at Vandenberg Air Force Base, after completing environmental testing.

NASA's Gravity Probe B mission, also known as GP-B, will use four ultra-precise gyroscopes to test Einstein's theory that space and time are distorted by the presence of massive objects. To accomplish this, the mission will measure two factors -- how space and time are warped by the presence of the Earth, and how the Earth's rotation drags space-time around with it.

Stanford University in Stanford (CA) and Lockheed Martin performed the testing. Shipped by road transport, the vehicle arrived July 10 at Vandenberg for pre-launch operations in anticipation of liftoff later this year.

Was Einstein Right?

NASA's Marshall Space Flight Center in Huntsville (AL) manages the GP-B program. NASA's prime contractor for the mission, Stanford University, conceived the experiment and is responsible for the design and integration of the science instrument, as well as for mission operations and data analysis. Lockheed Martin, a major subcontractor, designed, integrated and tested the spacecraft and some of its major payload components.

The erection of the Boeing Delta II launch vehicle on Space Launch Complex 2 (SLC-2) at Vandenberg Air Force Base is currently scheduled to begin on September 15 with erection of the first stage.  Attachment of the nine strap-on solid rocket boosters is scheduled to occur in sets of three on September 16 - 18.  The second stage is planned for mating atop the first stage on September 19.  Gravity Probe B will be transported from the spacecraft hangar to SLC-2 on October 29 and hoisted atop the second stage. The Delta II fairing will be installed around the spacecraft on November 5, part of final pre-launch preparations.

FMI: http://nmsp.gsfc.nasa.gov

Advertisement

More News

Airborne 11.05.25: Tesla Flying Car?, Jepp/ForeFlight Sold, A220 Troubles

Also: AFE25 Tickets!, Jamaica Recovery, E-Aircraft at Boeing Fld, Diamond DA50 RG Cert Elon Musk is once again promising the impossible…this time, in the form of a Tesla tha>[...]

Airborne 11.07.25: Affordable Expo Starts!, Duffy Worries, Isaacman!

Also: Louisville UPS Crash Aftermath, Taiwan Boosts Pilot Pool, Spartan Acquires, DON’T MISS the MOSAIC Town Hall! This three-day Affordable Flying Expo brings together indoo>[...]

Aero-News: Quote of the Day (11.05.25)

“Our strategic partnership with AutoFlight, backed by their substantial technological expertise and tangible advancements in eVTOL airworthiness, represents a significant mil>[...]

ANN's Daily Aero-Linx (11.05.25)

Aero Linx: British Gliding Association (BGA) The British Gliding Association is the governing body for the sport of gliding in the UK and members are the 76 clubs that provide glid>[...]

NTSB Prelim: Cirrus Design Corp SR22

While Descending Toward ASN, He Advanced The Throttle, But The Engine Did Not Respond On October 2, 2025, at 1126 central daylight time, a Cirrus SR22, N812SE, was substantially da>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC