Emergency AD (CASA): Pacific Aerospace Corporation Cresco | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Thu, Jun 17, 2004

Emergency AD (CASA): Pacific Aerospace Corporation Cresco

DCA/CRESCO/8 — Emergency Airworthiness Directive
Pacific Aerospace Corporation Cresco
DCA/CRESCO/8 Engine Mount Structure - Inspection

Applicability: Cresco 08-600 (file photo below) series aircraft equipped with Modification PAC/CT/0210, Installation of PT6A-34AG, or Modification PAC/CT/0291, Installation of PT6A-34.
Requirement: To prevent failure of the engine mount structure, accomplish the following:-Inspect per Pacific Aerospace Corporation Mandatory SB PACSB/CR/040. Also inspect the fuselage longer on in the area where the strut assemblies attach. Pay particular attention around all bolt holes and the steel bush fitting. Rectify any defects found before further flight.
Compliance: Within the next 10 hours TIS and thereafter at intervals not to exceed 300 hours TIS.
Effective Date: 18 June 2004

Background: This AD is prompted by failures of the engine mount strut assemblies. A recent failure occurred during a topdressing operation where the pilot heard a loud "crack" that sounded like a rifle shot. The aircraft’s engine was noticed to have slightly displaced. Following a safe landing, inspection revealed the left hand engine mount strut was broken adjacent to the forward attachment bolt fitting. It has been determined that the strut failed due to fatigue caused by excessive bending in the region of the welds. The manufacturer issued Mandatory Service Bulletin (MSB) PACSB/CR/040 on 15 June 2004 requiring certain inspections of the engine mount assembly. This AD requires compliance with the MSB within the next 10 hours time in service (TIS), and thereafter at intervals not to exceed 300 hours TIS.

FMI: www.caa.govt.nz/fulltext/nzcars/Emergency/DCA_CRESCO_8.pdf

Advertisement

More News

Oshkosh Memories: An Aero-News Stringer Perspective

From 2021: The Inside Skinny On What Being An ANN Oshkosh Stringer Is All About By ANN Senior Stringer Extraordinare, Gene Yarbrough The annual gathering at Oshkosh is a right of p>[...]

NTSB Prelim: Piper PA32RT

Video Showed That During The Takeoff, The Nose Baggage Door Was Open On May 10, 2025, about 0935 eastern daylight time, a Piper PA-32RT-300, N30689, was destroyed when it was invol>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

Aero-News: Quote of the Day (05.28.25)

"I think what is key, we have offered a bonus to air traffic controllers who are eligible to retire. We are going to pay them a 20% bonus on their salary to stay longer. Don't reti>[...]

ANN's Daily Aero-Term (05.28.25): Pilot Briefing

Aero Linx: Pilot Briefing The gathering, translation, interpretation, and summarization of weather and aeronautical information into a form usable by the pilot or flight supervisor>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC