AD Requires Cycling Of Power On Dreamliners | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sat, Dec 03, 2016

AD Requires Cycling Of Power On Dreamliners

FCMs Could Reset During Flight If Left On More Than 22 Consecutive Days

An Airworthiness Directive published in the Federal Register Friday requires repetitive cycling of either the airplane electrical power or the power to the three flight control modules (FCMs). This AD was prompted by a report indicating that all three FCMs might simultaneously reset if continuously powered on for 22 days on all Boeing 787-8 and 787-9 airplanes.

According to the FAA, reports have been received indicating that an FCM will reset if continuously powered on for 22 days. This condition, if not corrected, could result in simultaneous resets of all three FCMs, which could result in flight control surfaces not moving in response to flight crew inputs for a short time and consequent temporary loss of controllability.

The FAA is requiring compliance with the AD by all 99 Dreamliners registered to U.S. operators within a week.

The FAA considers this AD interim action. Boeing and its suppliers are developing a terminating solution to address the identified unsafe condition. Once this terminating solution is developed, approved, and available, the agency might consider additional rulemaking, according to the published AD.

The Seattle Times reports that in a statement, Boeing said that the AD addresses an issue that it has already been brought to the attention of Dreamliner operators. The company says a permanent software fix "is anticipated in the second quarter of 2017."

An aviation analyst who requested anonymity told the paper that airlines almost never leave a jet powered on for longer than a week.

The FAA estimates that the cost of cycling the power on the airplanes will cost about $85 per airplane per cycle.

(Image from file)

FMI: AD

Advertisement

More News

NTSB Final Report: Douglas A-4K

Pilot Applied Full Aft Stick And Nose-Up Trim, But The Airplane Remained On The Runway Analysis: The pilot reported that a preflight inspection and flight control checks revealed n>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: PBY Catalina--From Wartime to Double Sunrise to the Long Sunset

From 2022 (YouTube Edition): Before They’re All Gone... Humankind has been messing about in airplanes for almost 120-years. In that time, thousands of aircraft representing i>[...]

ANN's Daily Aero-Term (07.01.25): Advanced Air Mobility (AAM)

Advanced Air Mobility (AAM) A transportation system that transports people and property by air between two points in the NAS using aircraft with advanced technologies, including el>[...]

ANN's Daily Aero-Linx (07.01.25)

Aero Linx: MQ-1B Predator The MQ-1B Predator is an armed, multi-mission, medium-altitude, long-endurance remotely piloted aircraft that is employed primarily as an intelligence-col>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC