Dreamliner Fuselage Segments Arrive In Everett | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, May 13, 2007

Dreamliner Fuselage Segments Arrive In Everett

Components Dreamlifter-ed In For Assembly

Aero-News has learned three large composite fuselage sections arrived in Everett, WA Friday for the upcoming Boeing 787 Dreamliner.

The all-composite forward section -- known as section 41, and shown above wrapped in white -- is manufactured by Spirit AeroSystems at its facility in Wichita, KS. The complex structure is 21 feet in diameter and 42 feet long. Its landing gear is installed.

Sections 47 and 48, wrapped in black, are the two aft composite sections of fuselage for the Dreamliner. As Aero-News reported earlier this week, they were manufactured and joined by Vought Aircraft Industries at its facility in Charleston, SC. Section 47 is 23 feet long and 19 feet in diameter while section 48 measures 15 feet long and 14 feet in diameter.

The sections were delivered to Boeing early Friday morning via the Dreamlifter, a specially modified 747-400 used to transport 787 major assemblies. The aircraft arrived at 6:39 am local time. The major assemblies were immediately unloaded and delivered to the 787 final assembly factory.

"Today's delivery represents more than 40 percent of the 787's fuselage structure," said Scott Strode, 787 vice president of Airplane Definition and Production. "We now have all the major structure for the rear of the airplane, and its distinctive nose. The Dreamliner is beginning to take shape."

These are the second and third pieces of major structure delivered by the Dreamlifter in recent weeks. The horizontal stabilizer arrived on April 25.

The 787 Dreamliner is the fastest-selling airplane in aviation history, with firm orders for 567 airplanes from 44 airlines. Boeing is shooting for an official rollout of the first 787 prototype on July 8, 2007.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (12.12.25)

Aero Linx: Commercial Aviation Safety Team (CAST) Founded in 1997, the Commercial Aviation Safety Team (USCAST) has developed an integrated, data-driven strategy to reduce the comm>[...]

ANN's Daily Aero-Term (12.12.25): Land And Hold Short Operations

Land And Hold Short Operations Operations that include simultaneous takeoffs and landings and/or simultaneous landings when a landing aircraft is able and is instructed by the cont>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

NTSB Final Report: Cirrus Design Corp SF50

Pilot’s Inadvertent Use Of The Landing Gear Control Handle Instead Of The Flaps Selector Switch During The Landing Rollout Analysis: The pilot reported that during the landin>[...]

Airborne 12.08.25: Samaritan’s Purse Hijack, FAA Med Relief, China Rocket Fail

Also: Cosmonaut Kicked Out, Airbus Scales Back, AF Silver Star, Russian A-60 Clobbered A Samaritan’s Purse humanitarian flight was hijacked on Tuesday, December 2, while atte>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC