Lockheed Martin C-130J Program Marks Two Major Milestones | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Oct 07, 2009

Lockheed Martin C-130J Program Marks Two Major Milestones

200th Aircraft Will Be Equipped To Support Special Missions

Lockheed Martin began final assembly of the first HC/MC-130J Monday, which will also be the 200th C-130J to be produced. U.S. Air Force and company officials commemorated the milestones during a short ceremony on the production line by signing the keel of the historic C-130J that will be delivered in 2010.

"Again we see the C-130 setting new standards for mission flexibility," said Ross Reynolds, vice president of Lockheed Martin C-130 programs. "This new Special Mission configuration of the proven C-130J will give the U.S. Air Force unparalleled capability for Combat Search and Rescue, Personnel Recovery and Special Operations Missions. As demand for the C-130J continues to grow around the world, we will see more and more the way this aircraft can meet the demands of any operator and mission."

Lockheed Martin is under contract to the U.S. Air Force to build the HC/MC-130J Special Mission Hercules to replace aging fleets of Combat Search and Rescue HC-130s and Air Force Special Operations MC-130s. In April 2008, a Department of Defense Acquisition Decision Memorandum (ADM) was signed to start the HC/MC-130J program with a six-aircraft buy. Since that time, six more aircraft have been placed on contract and the latest ADM, signed on Aug. 26, 2009, authorized up to 22 HC/MC130J aircraft.

The new aircraft, based on a KC-130J tanker baseline, will have a host of factory installed provisions to support special mission operations. These include the Enhanced Service Life Wing, the Enhanced Cargo Handling System, a Universal Aerial Refueling Receptacle Slipway Installation (boom refueling receptacle), an Electro-Optic/Infrared Sensor, a Combat Systems Operator Station on the flight deck, dual military SATCOMs, Enhanced Vision System provisions, and higher capacity 60/90 kilovolt amp (KVA) generators. In-line production of this configuration reduces cost and schedule, allowing the aircraft to meet the required 2012 Initial Operational Capability.

FMI: www.lockheedmartin.com

Advertisement

More News

ANN's Daily Aero-Term (12.04.25): Cooperative Surveillance

Cooperative Surveillance Any surveillance system, such as secondary surveillance radar (SSR), wide-area multilateration (WAM), or ADS-B, that is dependent upon the presence of cert>[...]

ANN's Daily Aero-Linx (12.04.25)

Aero Linx: OX5 Aviation Pioneers Incorporated in 1955 as a Pa 501 (c)(3) Not for Profit Corporation, the OX5 Aviation Pioneers is dedicated to bringing before the public the accomp>[...]

NTSB Prelim: Extra Flugzeugproduktions EA 300/SC

The Pilot Appeared To Regain Control After Six Rotations And Attempted To “Fly Out” Inverted But Had Insufficient Altitude On November 8, 2025, at 1038 eastern standard>[...]

Classic Aero-TV: The Bally Bomber - The All Time Ultimate Warbird Replica?

From 2018 (YouTube Edition): Aero-News Talks With The Airplane's Builder One of the many unique airplanes at AirVenture 2018 was a 1/3-scale B-17 bomber built by Jack Bally, who ta>[...]

ANN's Daily Aero-Linx (12.05.25)

Aero Linx: Society of U.S. Army Flight Surgeons (SoUSAFS) The Society of US Army Flight Surgeons (SoUSAFS) serves to advance the science and art of Aerospace Medicine and its allie>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC