Powering The Dreamliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Feb 27, 2004

Powering The Dreamliner

7E7 Engine Selection In April

Engine manufacturers are looking forward to an April Boeing decision on 7E7 powerplants, Pratt & Whitney President-Commercial Engines Robert Leduc said at the Asian Aerospace 2004. The airframe manufacturer is taking the competing engine specifications to key airline customers. "I think technically [the competitors] will all make the [specification] hurdles. I think it comes down to terms and conditions and the market reaction," Leduc said.

Boeing firmed aircraft specifications just a few weeks ago, but now "we finally locked down on thrust and configuration," allowing Pratt to deliver its "best and final" engine specifications at the end of March, Leduc said. Current talks with Boeing center on "weight vs. SFC trades…I feel pretty good about the engine," now called the PE-EXX. "We do believe you need a whole new engine for a whole new airplane." The market is largely a replacement market in which Pratt has a strong position, with Rolls-Royce notably weaker.

So large is the prospective market -- 2,000-2,500 airplanes over 20 years by Boeing's forecast, 1,900 by conservative Pratt guesses -- that Leduc plans to keep the program going in the event the PW-EXX is not selected, slowed somewhat waiting for Airbus to make decisions on what it will do with its A330 to counter the 7E7 push. "We are building the HP (high pressure) rig as we speak" in preparation for testing that will be completed by year end.

Assembly of the first GP7000 is nearing completion, with the first test runs set for East Hartford, Conn., on March 7 to be followed by the second Pratt-built engine several weeks later.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC