EUTELSAT 36D Heads To Launch Site In The Belly of A BelugaST | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Mar 12, 2024

EUTELSAT 36D Heads To Launch Site In The Belly of A BelugaST

It Is The Fourth Airbus Eurostar Neo Satellite Delivered

The Airbus-built EUTELSAT 36D geostationary telecommunications satellite has been shipped from Toulouse, France to Sanford, Florida, USA, on board an Airbus BelugaST (A300-600ST). 

Its next step is the Kennedy Space Center, in Florida, where it will be launched into orbit aboard a SpaceX Falcon 9 later this month. With the advent of the new BelugaXL, based on the larger A330-200 platform, the A300-600 based BelugaST fleet is now fully available for outsized freight transport services globally.

EUTELSAT 36D is based on the latest generation Eurostar Neo geostationary telecommunications satellite and will provide TV broadcasting (DTH) and government services over Africa (including re-runs, no doubt), Europe and eastern countries and has a planned lifetime of more than 15 years.

Philippe Pham, Head of Telecommunications & Navigation Systems at Airbus, said: “EUTELSAT 36D is the latest milestone of our longstanding partnership with Eutelsat stretching back more than 30 years. It is the 22nd geo satellite we have built for them and will provide extended capacity over Africa and Eurasia.”

With 70 physical Ku-band transponders, the all-electric EUTELSAT 36D will assure all the main legacy missions of EUTELSAT 36B, with enhancements to coverage and performance.

It is the fourth Eurostar Neo in orbit. Eurostar Neo satellites combine increased payload capacity and more efficient power and thermal control systems with reduced production time and optimised costs as part of a fully digitalised production process. EUTELSAT 36D combines 18 kW of electric power with a reduced launch mass of approximately five metric tonnes, enabled by Airbus’ EOR (Electric Orbit Raising) capability, reinforcing Airbus’ position as the world leader in electric propulsion.

The Eurostar Neo family of Airbus telecommunications satellites is based on a next-generation platform and technologies, developed with the support of the European Space Agency (ESA), and others, including the Centre National d’Etudes Spatiales (CNES) and the UK Space Agency (UKSA).

This is the third time that a Beluga transport aircraft is delivering an Airbus geostationary satellite to the Kennedy Space Center in Florida. Previous missions include HOTBIRD 13G on 17 October 2022 and Inmarsat 6-F2 on 30 January 2023. 

FMI: https://aircraft.airbus.com/en/services/expand/airbus-beluga-transport

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

NTSB Final Report: Capella Aircraft Corp FW1C50

Pilot Reported That He Was Unfamiliar With The Single Seat Amateur-Built Airplane And His Intent Was To Perform High-Speed Taxi Testing Analysis: The pilot reported that he was unf>[...]

Classic Aero-TV: Timber Tiger Touts Curtiss Jenny Replicas

From 2023 (YouTube Edition): First Kits to Ship October 2023 Having formerly resurrected the storied shape of the Ryan ST—in effigy, anyway—Montrose, Colorado-based Tim>[...]

ANN's Daily Aero-Term (07.04.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC