Fourth G650 Now In Flight Test Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-08.25.25

Airborne-NextGen-08.26.25

AirborneUnlimited-08.27.25

Airborne-AffordableFlyers-08.28.25

AirborneUnlimited-08.22.25

Tue, Jun 22, 2010

Fourth G650 Now In Flight Test Program

First Production Aircraft To Begin Testing

A fourth aircraft is now part of the Gulfstream G650 flight-test program, Gulfstream Aerospace announced Monday. The newest test aircraft flew for the first time June 6 and has spent more than five hours in the air.

Unlike its three predecessors, the fourth G650 (S/N 6004) is a production aircraft. S/N 6004 will be the first G650 outfitted and tested with a full interior, which will be installed later this summer. The aircraft, which will be used to evaluate the aircraft's cabin systems, is expected to resume flight testing following the installation.


File Photo

The G650 flight-test program involves an estimated 1,800 hours of flight and a specific purpose for each of five aircraft. S/N 6001 is focused on envelope expansion, air data calibration, flutter, in-flight performance and flight controls. S/N 6002 is used to evaluate the aircraft's systems, while S/N 6003 tests the avionics, in-flight load measurement and ice protection system. S/N 6005, which has been turned over to the Flight Test department for outfitting, will participate in the reduced vertical separation minimum testing.

The G650 flight-test program officially began on Nov. 25, 2009. Through June 20, the four aircraft currently in the program have completed more than 85 flights and 240 flight-test hours.

Ultimate load testing of the aircraft's primary structural components has also begun. In April, the aircraft completed the structural limit load testing required by the FAA and the EASA. The limit load represents the maximum load the aircraft should experience during its life cycle. Ultimate load is 50 percent more than limit load. Ultimate load testing will be performed on the fuselage, wing, vertical and horizontal stabilizers, nose landing gear and all control surfaces.


File Photo

The G650 has also flown at its maximum takeoff weight of 99,600 pounds and recently reached its maximum operational Mach number of Mach 0.925 at 42,500 feet.

The aircraft is expected to receive certification from the FAA and EASA in 2011. It is on schedule to enter service in 2012.

FMI: www.gulfstream.com

Advertisement

More News

Aero-News: Quote of the Day (08.28.25)

“We have seen astounding demand for the G800, and the entire Gulfstream team is excited to begin making deliveries to our customers. The G800 is entering service with extraor>[...]

ANN's Daily Aero-Linx (08.28.25)

Aero Linx: Recreational Aviation Australia (RAAus) Recreational Aviation Australia is progressively working towards improving safety outcomes through a holistic approach to safety >[...]

Classic Klyde Morris (08.25.25)

Classic Klyde Morris From 11.07.16 (and Remembering Bob...) FMI: www.klydemorris.com>[...]

Airborne 08.25.25: Zenith Homecoming, VP Racing, Affordable Flying Expo 2025

Also: GADFLY AI-Driven Engine Analysis, Knockoff Iranian Drones, Russian Surveillance, 40 NASA Missions Chopped This year’s Zenith Homecoming event will soon be taking off at>[...]

Airborne 08.22.25: ARC Spinoff, Nat'l Championship Air Races, Hawkins Accident

Also: H55 Completes American Tour, Robinson Trade-Ins, Retired AV-8B Harrier, NS-35 Mission Organizers of the iconic annual Air Race Classic will soon be opening registration for t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC