ExoMars Carrier Module Prepares For Final Pre-launch Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Apr 13, 2019

ExoMars Carrier Module Prepares For Final Pre-launch Testing

Will Look For Evidence That Life Once Existed On Mars

The module that will carry the ExoMars rover and surface science platform from Earth to Mars has arrived in Italy for final integration preparations. The module, along with electrical ground support equipment, shipped from OHB System in Bremen, Germany, arrived on April 2 at Thales Alenia Space in Turin, Italy.

The mission is the second in the joint ESA-Roscosmos ExoMars program that is exploring the possibility of whether life has ever existed on Mars.

The Trace Gas Orbiter is already at Mars, analysing the planet’s atmosphere, and mapping subsurface water. It will also act as a data relay for the next mission, which is scheduled to launch in July 2020, delivering a rover and surface science platform to the Red Planet in March 2021.

The carrier module also provides the communication link between Earth and the spacecraft, and will support navigation with star trackers and Sun sensors. It also carries propellant required for attitude control and manoeuvres through its 16 20-N thrusters that will use up to 300 pounds of hydrazine propellant.

The landing platform, named Kazachok, also recently arrived in Europe from Russia, while the rover, named after Rosalind Franklin, is being fitted out with its scientific instruments at Airbus in Stevenage, U.K. “This is an important milestone, as the carrier module is the ‘vessel’ that will take Rosalind Franklin all the way to Mars,” says Thierry Blancquaert, ESA ExoMars spacecraft systems engineering team leader.

During the nine-month interplanetary journey, the 1,763-pound carrier module will transport Kazachok and Rosalind the rover within a single, 2-metric ton descent module, providing electrical power via a solar array. The solar panels will generate about 2 kW of power, up to 400W of which can be provided to the descent module; energy is stored in a 54-pound battery. “During the cruise to Mars, the Carrier Module provides all resources to the descent module and rover,” says Stéphane Langlois, ExoMars spacecraft systems engineer at ESA. “Upon approach to the Red Planet, the carrier module plays a critical role to ensure that the descent module is delivered in the best possible conditions for a successful entry.”

Telemetry and data will be stored and transmitted via the onboard computer located in the descent module.

The descent module, which does not produce any power by itself during launch and transfer, will separate from the carrier module shortly before reaching the martian atmosphere. The descent module will deliver the rover and platform safely to the surface while the carrier module will burn up in the atmosphere.

In the coming months, the carrier module will be mated with the descent module. The resulting composite spacecraft will then undergo further testing to ensure it is ‘qualified’ for its launch into the space environment. “We are thrilled to see all components finally coming together and we are looking forward to the next phase of testing ahead of launch next year,” says François Spoto, ESA’s ExoMars team leader.

(Image provided with European Space Agency news release)

FMI: www.esa.int

Advertisement

More News

ANN's Daily Aero-Linx (12.12.25)

Aero Linx: Commercial Aviation Safety Team (CAST) Founded in 1997, the Commercial Aviation Safety Team (USCAST) has developed an integrated, data-driven strategy to reduce the comm>[...]

ANN's Daily Aero-Term (12.12.25): Land And Hold Short Operations

Land And Hold Short Operations Operations that include simultaneous takeoffs and landings and/or simultaneous landings when a landing aircraft is able and is instructed by the cont>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

NTSB Final Report: Cirrus Design Corp SF50

Pilot’s Inadvertent Use Of The Landing Gear Control Handle Instead Of The Flaps Selector Switch During The Landing Rollout Analysis: The pilot reported that during the landin>[...]

Airborne 12.08.25: Samaritan’s Purse Hijack, FAA Med Relief, China Rocket Fail

Also: Cosmonaut Kicked Out, Airbus Scales Back, AF Silver Star, Russian A-60 Clobbered A Samaritan’s Purse humanitarian flight was hijacked on Tuesday, December 2, while atte>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC