Deployment Of Floodwall Underway At St. Paul Downtown Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Tue, Mar 15, 2011

Deployment Of Floodwall Underway At St. Paul Downtown Airport

Precautionary Measure Against Expected Mississippi River Flooding

With spring flooding of the Mississippi River at St. Paul all but certain, work crews from the Metropolitan Airports Commission (MAC) began deploying temporary sections of floodwall at St. Paul Downtown Airport (KSTP) on Monday. “Prior to developing the floodwall in 2009, flooding sometimes caused hundreds of thousands of dollars of damage and expense and closed St. Paul Downtown Airport for weeks at a time,” said MAC Executive Director Jeff Hamiel. “The floodwall is designed to protect the airport against a hundred-year flood, safeguarding infrastructure and minimizing operational impacts.”

This is the fourth time the floodwall has been deployed at the airport, having been erected once in 2009 and twice in 2010. The 9,532’ dike includes 4,563’ of permanently installed sheet pile wall, 3,595’ of temporary, deployable wall and 1,374’ of earthen levee. MAC staff can deploy temporary sections of the wall in about a week.

Portions of the wall along Bayfield Street and those crossing the airport’s two shortest runways, 13-31 and 9-27, will be erected first, leaving the longest, primary runway, 14-32, unaffected as long as possible. As the water rises, the MAC will close storm sewer gates to prevent river water from backing up onto the airport, and pumps will be activated to drain water that does collect there.

If necessary, MAC also will install the deployable wall crossing the far southeastern end of 14-32, sealing off the airfield from the river. Barring unforeseen circumstances, Runway 14-32 will remain operational with the wall in place, but the landing threshold will be displaced, shortening the operational portion of runway pavement from 6,491’ to 5,341’. The two shorter runways already have been temporarily closed. The Federal Aviation Administration will remove navigational aids located outside the floodwall to protect them from water damage. The wall will remain in place until the danger of flooding has passed.

FMI: www.mspairport.com

Advertisement

More News

NTSB Prelim: Lancair NLA-275-FR-C

About 2132 And At 11,800 Ft MSL, The Airplane Began A Rapid Right Spiraling Descent On August 18, 2025, about 2133 central daylight time, a Lancair NLA-275-FR-C airplane, N345LA, w>[...]

ANN's Daily Aero-Linx (09.12.25)

Aero Linx: The Collings Foundation The Collings Foundation is a non-profit, Educational Foundation (501(c)3), founded in 1979. The purpose of the Foundation is to preserve and exhi>[...]

Aero-News: Quote of the Day (09.12.25)

"This first FAA certification enables us to address the pilot shortage crisis with modern training solutions. Flight schools need alternatives to aging fleets with 40-year-old desi>[...]

ANN's Daily Aero-Term (09.12.25): North Atlantic High Level Airspace (NAT HLA)

North Atlantic High Level Airspace (NAT HLA) That volume of airspace (as defined in ICAO Document 7030) between FL 285 and FL 420 within the Oceanic Control Areas of Bodo Oceanic, >[...]

Aero-News: Quote of the Day (09.13.25)

“HITRON embodies the Coast Guard’s spirit of innovation and adaptability. From its humble beginnings as a prototype program, it has evolved into a vital force in our co>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC