Opportunity Ready To Roll | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Sat, Jan 31, 2004

Opportunity Ready To Roll

Spirit Getting Better

Scientists at NASA's Jet Propulsion Laboratory in Pasadena (CA) were getting ready Friday to roll the Mars rover Opportunity off its lander, as its beleaguered twin, Spirit, began transmitting scientific data for the first time in more than 10 days.

Spirit's problems were apparently solved when JPL engineers deleted about 1700 "non-essential files" from its internal drive. They then rebooted the rover's computer and returned it to normal operating mode, whereas before, it had been in "crippled" or safe mode.

"I'm pleased to report that it seems to be working fine," said Glenn Reeves, the mission's chief software engineer. "We alleviated the problem."

Opportunity Knocks

In the meantime, Spirit's twin rover, Opportunity, was being readied to leave its lander at 12:30 a.m. EST Saturday morning. Compared to the obstructions Spirit faced, Opportunity appears to have a clear path to its first destination.

"At this point we have a very benign egress path so we're not too worried," said systems engineer Daniel Limonadi.

Opportunity sits half a world away from Spirit, conducting the same sort of search for signs that water once covered the now desolate Red Planet. Opportunity does suffer one problem. A faulty thermostat repeatedly turns itself off and on without being commanded to do so by JPL. It controls the heating units that keep the vehicle from overheating. At this point, engineers don't believe it to be a major problem.

Already, Opportunity is providing JPL scientists with a wealth of data, including some that indicates there was indeed a lot of water surrounding its landing zone. Opportunity is on the Meridiani Planum, inside a small crater -- 66 feet wide and 10 feet deep -- not far from an outcropping of pale bedrock.

It's that bedrock which could hold the key to determining once and for all whether water ran freely over the surface of Mars millenia ago. Ray Arvidson, deputy principal investigator, said Opportunity's mini-thermal imaging spectrometer (mini-TES) seems to have confirmed the presence of the iron-bearing mineral gray hematite near the bedrock. On Earth, hematite generally forms in bodies of water where there's a strong presence of lava rich in iron. The Mars Global Surveyor first detected possible deposits of hematite about the size of Oklahoma on the Martian surface. That discovery led to the selection of Opportunity's landing site.

"We're still in the process of looking at the data," Arvidson said. "But if you look at the mini-TES team they have huge smiles on their faces."

FMI: http://mars.jpl.nasa.gov

Advertisement

More News

NTSB Final Report: Aviat A1

Airplane Bounced About 3 Ft Then Touched Back Down And Then, With No Brakes Applied, The Airplane Began Veering To The Left Analysis: The pilot entered the airport traffic pattern >[...]

ANN's Daily Aero-Linx (07.08.25)

Aero Linx: British Microlight Aircraft Association (BMAA) The primary focus within all aviation activity is SAFETY. In all aspects of our sport SAFETY must come first, whether it b>[...]

Classic Aero-TV: Fly Corvair’s Reliable Engine Alternative

From SnF25 (YouTube Edition): William Wynne Builds Practical Aircraft Engines on the Corvair Platform Seeking an affordable alternative to the traditional aircraft engine options, >[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: CiES Fuel-Quantity and e-Throttle Systems Praised

From 2023 (YouTube Edition): Bridge of CiES CiES Inc. is a Bend, Oregon-based designer and manufacturer of modular embedded aircraft systems and sensors. The company’s fuel-l>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC