NASA Updates Spacewalk Assignments | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Wed, Mar 27, 2019

NASA Updates Spacewalk Assignments

Crew Installing Lithium-Ion Batteries For One Pair Of The Station's Solar Arrays, Redundant Power Path For Canadarm2

With the first in a series of three spacewalks successfully completed at the International Space Station, NASA has updated astronaut assignments for the remaining two spacewalks.

NASA astronauts Nick Hague and Anne McClain conducted the first spacewalk in this series on March 22. Hague and fellow NASA astronaut Christina Koch now are preparing to conduct the second spacewalk Friday, March 29, during which they will continue work started on the first spacewalk to install powerful lithium-ion batteries for one pair of the station's solar arrays.

Koch had been scheduled to conduct this spacewalk with astronaut McClain, in what would have been the first all-female spacewalk. However, after consulting with McClain and Hague following the first spacewalk, mission managers decided to adjust the assignments, due in part to spacesuit availability on the station. McClain learned during her first spacewalk that a medium-size hard upper torso – essentially the shirt of the spacesuit – fits her best. Because only one medium-size torso can be made ready by Friday, March 29, Koch will wear it.

Mission experts previewed the tasks for the first two spacewalks during a March 19 news conference.

McClain now is tentatively scheduled to perform her next spacewalk – the third in this series – on Monday, April 8 with Canadian Space Agency astronaut David Saint-Jacques. Assignments for this spacewalk will be finalized following completion of the second spacewalk.

McClain and Saint-Jacques will lay out jumper cables between the Unity module and the S0 truss, at the midpoint of the station's backbone, during their April 8 spacewalk. This work will establish a redundant path of power to the Canadian-built robotic arm, known as Canadarm2. They also will install cables to provide for more expansive wireless communications coverage outside the orbital complex, as well as for enhanced hardwired computer network capability.

These will be the 215th and 216th spacewalks in the history of International Space Station assembly and maintenance. During the first spacewalk of the series, on March 22, McClain became the 13th woman to perform a spacewalk. Koch will become the 14th on March 29.

(Image provided with NASA news release [L-R] Hague, Koch, McClain)

FMI: www.nasa.gov/station

Advertisement

More News

NTSB Final Report: Aviat A1

Airplane Bounced About 3 Ft Then Touched Back Down And Then, With No Brakes Applied, The Airplane Began Veering To The Left Analysis: The pilot entered the airport traffic pattern >[...]

ANN's Daily Aero-Linx (07.08.25)

Aero Linx: British Microlight Aircraft Association (BMAA) The primary focus within all aviation activity is SAFETY. In all aspects of our sport SAFETY must come first, whether it b>[...]

Classic Aero-TV: Fly Corvair’s Reliable Engine Alternative

From SnF25 (YouTube Edition): William Wynne Builds Practical Aircraft Engines on the Corvair Platform Seeking an affordable alternative to the traditional aircraft engine options, >[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: CiES Fuel-Quantity and e-Throttle Systems Praised

From 2023 (YouTube Edition): Bridge of CiES CiES Inc. is a Bend, Oregon-based designer and manufacturer of modular embedded aircraft systems and sensors. The company’s fuel-l>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC